in this paper, a genetic algorithm is presented for an identical parallel-machine scheduling problem with family setup time that minimizes the total weighted flow time ( ). no set-up is necessary between jobs belonging to the same family. a set-up must be scheduled when switching from the processing of family i jobs to those of another family j, i j, the duration of this set-up being the sequ...
data envelopment analysis (dea) is a powerful tool for measuring relative efficiency of organizational units referred to as decision making units (dmus). in most cases dmus have network structures with internal linking activities. traditional dea models, however, consider dmus as black boxes with no regard to their linking activities and therefore do not provide decision makers with the reasons...
This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...
this paper explores the flexile flow lines where setup times are sequence- dependent. the optimization criterion is the minimization of total weighted completion time. we propose an iterated greedy algorithm (iga) to tackle the problem. an experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of iga are compared against those of some other exist...
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
nowadays, the environmental impact of transportation project and, especially air pollution impacts, are major concerns in evaluating transportation projects. based on this concern, beside definition of traditional objective functions like total travel time and total investment cost, different type of environmental related function is considered as objective function in urban network design. in...
this paper considers a two-stage assembly flow shop problem (tafsp) where m machines are in the first stage and an assembly machine is in the second stage. the objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. jit seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...