In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...
In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...
nowadays in trade and economic issues, prediction is proposed as the most important branch of science. existence of effective variables, caused various sectors of the economic and business executives to prefer having mechanisms which can be used in their decisions. in recent years, several advances have led to various challenges in the science of forecasting. economical managers in various fi...
This paper investigates the optimal refilling policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article [Chiu, Y.P., 2003. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 35, 427-437] has studied...
Recently, in Mathematical and Computational Applications Journal Chiu et al. [1] and Chen and Chiu [2] propose an inventory model based on EPQ with rework to determine the replenishment lot size and the number of shipments for a vendor-buyer integrated production-inventory system. They solve the inventory problem by considering both variables as continuous. However, the number of shipments must...
The possible variability of project delay is useful information to understand and mitigate the project delay risk. However, it is not sufficiently considered in the literature concerning effort estimation and simulation in software product line development. In this paper, we propose a project delay simulation model by introducing a random variable to represent the variability of adaptive rework...
W study how rework routing together with wage and piece-rate compensation can strengthen incentives for quality. Traditionally, rework is assigned back to the agent who generates the defect (in a self-routing scheme) or to another agent dedicated to rework (in a dedicated routing scheme). In contrast, a novel cross-routing scheme allocates rework to a parallel agent performing both new jobs and...
This paper presents a test, diagnosis, and rework analysis model for use in manufacturing process modeling. The approach includes a model of functional test operations characterized by fault coverage, false positives, and defects introduced in test, in addition to rework and diagnosis (diagnostic test) operations that have variable success rates and their own defect introduction mechanisms. The...
EPQ model; Replenishment lot size; Multiple deliveries; Random defective items; Production; Rework; Scrap items. Abstract This paper derives the optimal replenishment lot size and shipment policy for an Economic Production Quantity (EPQ) model with multiple deliveries and rework of random defective items. The classic EPQmodel assumes a continuous inventory issuing policy for satisfying demand a...