Journal: :journal of optimization in industrial engineering 0
mehdi yazdani department of industrial engineering, faculty of industrial and mechanical engineering, islamic azad university, qazvin branch, qazvin, iran bahman naderi department of industrial engineering, faculty of engineering, kharazmi university, tehran, iran

although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. but, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. this paper considers the problem of scheduling no-idle hybrid flow shops. a mixed integer linear programming model is first developed to mathematically form...

Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...

Journal: :European Journal of Operational Research 2009
Yaroslav Goncharov Sergey Sevastyanov

The makespan minimization problem in flow shops with no-idle constraints on machines is considered. The latter means that each machine, once started, must process all its operations without intermediate idle time until all those operations are completed. The problem is known to be strongly NP-hard already for three machines. While being based on a geometrical approach, we propose several polyno...

Journal: :international journal of supply and operations management 2014
bahman naderi vahid roshanaei

in some industries as foundries, it is not technically feasible to interrupt a processor between jobs. this restriction gives rise to a scheduling problem called no-idle scheduling. this paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. the problem is first mathematically formulated by three different mixed integer linear programming...

Today, the flow shop environment is the most customary production area in industry. But, the need to increase the capacity or the capacity balance in different production processes has caused that in some working stations there exists more than one machine. This type of flow shops are usually named hybrid flow shop, multi processes flow shop, flexible flow shop or flow shop with parallel machin...

In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming...

Journal: :Archives of Control Sciences 2015

Esmaeil Mehdizadeh Fariborz Jolai Masoud Jenabi Mohammad Aliabadi

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

نمودار تعداد نتایج جستجو در هر سال