نتایج جستجو برای: Hydro-thermal self-scheduling (HTSS)

تعداد نتایج: 813833  

This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...

Journal: :Appl. Soft Comput. 2015
Jamshid Aghaei Abdollah Ahmadi Abdorreza Rabiee Vassilios G. Agelidis Kashem M. Muttaqi Heidar Ali Shayanfar

In this paper, a stochastic multiobjective framework is proposed for a day-ahead short-term Hydro Thermal Self-Scheduling (HTSS) problem for joint energy and reserve markets. An efficient linear formulations are introduced in this paper to deal with the nonlinearity of original problem due to the dynamic ramp rate limits, prohibited operating zones, operating services of thermal plants, multi-h...

Journal: :international journal of mathematical modelling and computations 0
s. kavitha assistant professor mathematics section faculty of engineering and technology annamalai university tamilnadu, india india assistant professor mathematics section faculty of engineering and technology annamalai university, annamalai nagar, chidambaram tamilnadu, india nirmala p.ratchagar professor, department of mathematics, annamalai university annamalai nagar, tamilnadu, 608002, india india professor,department of mathematics,annamalai universityannamalai nagar,tamilnadu, 608002, india

this paper presents a simplifiedlagrangian multiplier based algorithm to solve the fixed head hydrothermalscheduling problem. in fixed head hydrothermal scheduling problem, waterdischarge rate is modeled as quadratic function of hydropower generation andfuel cost is modeled as quadratic function of thermal power generation. thepower output of each hydro unit varies with the rate of water discha...

Nirmala P.Ratchagar S. Kavitha

This paper presents a simplifiedlagrangian multiplier based algorithm to solve the fixed head hydrothermalscheduling problem. In fixed head hydrothermal scheduling problem, waterdischarge rate is modeled as quadratic function of hydropower generation andfuel cost is modeled as quadratic function of thermal power generation. Thepower output of each hydro unit varies with the rate of water discha...

2012
Deepika Yadav V. Sharma

The short term hydrothermal scheduling (STHTS) is a daily planning proposition in power system operation. The main purpose of hydro thermal generation scheduling is to minimize the overall operation cost and to satisfy the given constraints by scheduling optimally the power outputs of all hydro and thermal units under study periods, given electrical load and limited water resource. This paper p...

2013
Alireza Soroudi

This paper proposes a robust optimization model for optimal self scheduling of a hydro-thermal generating company. The proposed model is suitable for price taker Gencos which seeks the optimal schedule of its thermal and hydro generating units for a given operating horizon. The uncertainties of electricity prices are modeled using robust optimization approach to make it more practical. It consi...

2013
Rajesh Kumar Vijay Garg Bharat Lal

This paper presents a study of various researches which were come out in last few decades on hydro thermal scheduling problems. As we know that the Operation of mix both hydro and thermal plants is far more complex and is of much more importance in a modern power system. The aim of the hydrothermal scheduling problem is to optimize the electricity production and minimized the cost of power. Thi...

2012
J. Kluabwang

An economic operation scheduling problem of a hydro-thermal power generation system has been properly solved by the proposed multipath adaptive tabu search algorithm (MATS). Four reservoirs with their own hydro plants and another one thermal plant are integrated to be a studied system used to formulate the objective function under complicated constraints, eg water managements, power balance and...

2012
VIMAL SINGH BISHT YR SOOD SURYAKANT NIKHIL KUSHWAHA

Operation of a system having both hydro and thermal plants is far more complex and is of much more importance in a modern interconnected power system. The objective of the STHS problem is to optimize the electricity production, considering a short-term planning horizon. This paper presents an extensive review of a short term hydro thermal scheduling problem. The paper demonstrates results of va...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید