نتایج جستجو برای: Generalized flow shop

تعداد نتایج: 651846  

Farhad Ghassemi-Tari Laya Olfat

Four heuristic algorithms are developed for solving the generalized version of tardiness flow shop problems. We consider the generalized tardiness flow shop model with minimization of the total tardiness as its performance measure. We modify the concept of cost over time (COVERT) for the generalized version of the flow shop tardiness model and employ this concept for developing four algorithms....

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه پیام نور - دانشگاه پیام نور استان تهران - دانشکده علوم ریاضی و مهندسی کامپیوتر 1392

heuristics are often used to provide solutions for flow shop scheduling problems.the performance of a heuristic is usually judged by comparing solutions and run times on test cases.this investigation proposes an analytical alternative ,called asymptotic convergence ,which tests the convergence of the heuristic to a lower bound as problem size grows. the test is a stronger variation of worst cas...

Farhad Ghassemi-Tari Laya Olfat

This paper considers the problem of scheduling n jobs in the generalized tardiness flow shop problem with m machines. Seven algorithms are developed for finding a schedule with minimum total tardiness of jobs in the generalized flow shop problem. Two simple rules, the shortest processing time (SPT), and the earliest due date (EDD) sequencing rules, are modified and employed as the core of seque...

2011
Farhad Ghassemi-Tari Laya Olfat

This paper considers the problem of scheduling n jobs in the generalized tardiness flow shop problem with m machines. Seven algorithms are developed for finding a schedule with minimum total tardiness of jobs in the generalized flow shop problem. Two simple rules, the shortest processing time (SPT), and the earliest due date (EDD) sequencing rules, are modified and employed as the core of seque...

Journal: :J. Intelligent Manufacturing 2005
Lixin Tang Wenxin Liu Jiyin Liu

A hybrid flow shop (HFS) is a generalized flow shop with multiple machines in some stages. HFS is fairly common in flexible manufacturing and in process industry. Because manufacturing systems often operate in a stochastic and dynamic environment, dynamic hybrid flow shop scheduling is frequently encountered in practice. This paper proposes a neural network model and algorithm to solve the dyna...

Today, the flow shop environment is the most customary production area in industry. But, the need to increase the capacity or the capacity balance in different production processes has caused that in some working stations there exists more than one machine. This type of flow shops are usually named hybrid flow shop, multi processes flow shop, flexible flow shop or flow shop with parallel machin...

Journal: :IAES International Journal of Artificial Intelligence (IJ-AI) 2013

Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...

Journal: :روش های عددی در مهندسی (استقلال) 0
عزیزاله معماریانی و قاسم مصلحی a. memariani g. moslehi

flow shop sequencing problem is included in np-hard problems and a number of heuristic methods have been developed to solve it. most of these methods are offered for the crisp processing time. however fuzzy algorithm is appropriate for the problems with fuzzy processing time. this paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

Journal: :journal of optimization in industrial engineering 2010
jafar razmi reza tavakoli moghaddam mohammad saffari

this paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. in the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). however,, two significant criteria for each schedule in stochastic models are: expectable m...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید