نتایج جستجو برای: Flexible flow shop scheduling

تعداد نتایج: 657574  

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه پیام نور - دانشگاه پیام نور استان تهران - دانشکده علوم ریاضی و مهندسی کامپیوتر 1392

heuristics are often used to provide solutions for flow shop scheduling problems.the performance of a heuristic is usually judged by comparing solutions and run times on test cases.this investigation proposes an analytical alternative ,called asymptotic convergence ,which tests the convergence of the heuristic to a lower bound as problem size grows. the test is a stronger variation of worst cas...

Journal: :journal of industrial engineering, international 2009
m.t taghavi-fard h.r dehnar saidy

in this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. this study seems utterly new and it is applicable to any performance measure based on the completion time. the in...

2009
Xiaofeng Li Hai Zhao

Flexible flow shop scheduling problem (also called blended flow shop scheduling problem) is a sort of complex Job Shop Scheduling problem. For the Flexible Flow Shop scheduling problem, only in very special cases, there are polynomial optimal algorithms. In most of the other cases, the problems are NP-Hard. It is a simplification of the original problem to solve Flexible flow shop scheduling wi...

Raviteja Buddala Siba Sankar Mahapatra

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

Today, the flow shop environment is the most customary production area in industry. But, the need to increase the capacity or the capacity balance in different production processes has caused that in some working stations there exists more than one machine. This type of flow shops are usually named hybrid flow shop, multi processes flow shop, flexible flow shop or flow shop with parallel machin...

Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...

2005
ANTÓNIO FERROLHO

In this paper, scheduling problems in Flexible Manufacturing Cells (FMC) are studied. The scheduling objective is to minimize the makespan. We used a genetic algorithm (GA) for solving the optimization scheduling problem. We have developed one FMC with industrial characteristics with the objective of studying scheduling problems in these types of manufacturing systems (single machine scheduling...

and M. A. Beheshti Nia, I. Nakhaee, M.R. Amin Naseri,

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

and M. A. Beheshti Nia, I. Nakhaee, M.R. Amin Naseri,

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

H.R Dehnar Saidy M.T Taghavi-Fard

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید