نتایج جستجو برای: Flexible Flow Line

تعداد نتایج: 978376  

Journal: :journal of optimization in industrial engineering 2015
bahman naderi mehdi yazdani

although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. this paper deals with scheduling jobs in lot streaming flexible flow line problems. the paper mathematically formulates the problem by a mixed integer linear programming model. this model solves small instances to optimality. moreo...

Journal: :journal of optimization in industrial engineering 2010
bahman naderi mostafa zandieh seyed mohammad taghi fatemi ghomi

this paper explores the flexile flow lines where setup times are sequence- dependent. the optimization criterion is the minimization of total weighted completion time. we propose an iterated greedy algorithm (iga) to tackle the problem. an experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of iga are compared against those of some other exist...

Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...

Alistair Clark Masoumeh Mahdieh Mehdi Bijari,

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

Journal: :DEStech Transactions on Engineering and Technology Research 2020

Journal: :iranian journal of fuzzy systems 2012
ali ghodratnama seyed ali torabi raza tavakkoli-moghaddam

this paper addresses a new version of the exible ow line prob- lem, i.e., the budget constrained one, in order to determine the required num- ber of processors at each station along with the selection of the most eco- nomical process routes for products. since a number of parameters, such as due dates, the amount of available budgets and the cost of opting particular routes, are imprecise (fuzz...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه تحصیلات تکمیلی علوم پایه زنجان - دانشکده فیزیک 1392

in the first part of this thesis we explored wetting and its dynamics for small droplets. first, we showed how a simple feature of water droplets on a surface, i.e. laplace pressure, can be exploited to build a micropump. we investigated capillary pumping in microchannels both experimentally and numerically. putting two droplets of different sizes at the in/outlet of a microchannel, will ge...

This paper addresses a new version of the exible ow line prob- lem, i.e., the budget constrained one, in order to determine the required num- ber of processors at each station along with the selection of the most eco- nomical process routes for products. Since a number of parameters, such as due dates, the amount of available budgets and the cost of opting particular routes, are imprecise (fuzz...

Hamid Davoudpour Hamidreza Kia Seyed Hassan Ghodsypour

In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...

2008
R. Tavakkoli-Moghaddam N. Safaei

This chapter presents a novel, mixed-integer programming model of the flexible flow line problem that minimizes the makespan of a product. The proposed model considers two main constraints, namely blocking processors and sequence-dependent setup time between jobs. We extend two previous studies conducted by Kurz and Askin (2004) and Sawik (2001), which considered only one of the foregoing const...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید