Koot - Hamoodi are two units from seventh units out of 1&2 irrigation and drainage network in Dasht-Azadeghan project where was past about 7 years from their operation. Results of the studies were showed before construction of network; ground water table in considered of this area was high and more than 90% of these lands were high and too high in saline and alkaline. After construction and ope...