نتایج جستجو برای: Competency project scheduling

تعداد نتایج: 324393  

Journal: :international journal of optimaization in civil engineering 0
e. hemat m.v.n. sivakumar

critical path method (cpm) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. despite its popularity, cpm has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. the analytical competency and computing capability of cpm thus...

In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...

Journal: :journal of optimization in industrial engineering 2013
mostafa nikkhah nasab amir abbas najafi

projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. an integer programming model is formulated for the project portfolio selection and scheduling.two heuristic algorithms, genetic algorithm (ga) and simulated annealing (sa), are presented to solve the problem. results of cal...

Hemat, E., Sivakumar, M.V.N. ,

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

Journal: :مهندسی صنایع 0
ایمان بساق زاده دانشگاه صنعتی اصفهان سید رضا حجازی دانشگاه صنعتی اصفهان امیر موسی احسان دانشگاه صنعتی شریف

the research on project scheduling has widely expanded over the last few decades. the vast majority of these research efforts focus on exact and suboptimal procedures for constructing a workable schedule, assuming complete information and a static deterministic problem environment. project activities are scheduled subject to both technological precedence constraints and resource constraints, mo...

Journal: :journal of optimization in industrial engineering 0
behrouz afshar nadjafi department of industrial engineering, islamic azad university of qazvin, qazvin, iran, shahram shadrokh department of industrial engineering, sharif university of technology, tehran, iran,

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Journal: :international journal of industrial engineering and productional research- 0
m. ranjbar department of industrial engineering, faculty of engineering, ferdowsi university of mashhad, mashhad

project scheduling   net present value   we consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. in this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a time ...

Journal: :amirkabir international journal of modeling, identification, simulation & control 2015
i. bossaghzadeh s. r. hejazi z. pirmoradi

a common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. as a result, project managers are often unable to meet the deadline time of the milestones. robust project scheduling is an effective approach in case of uncertainty. upon adopting this approach, schedules are protected against po...

Journal: :journal of optimization in industrial engineering 2010
behrouz afshar nadjafi shahram shadrokh

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

2013

Identifying and developing project managers’ competencies arebecoming more and more important in today’s competitive market. This importance also has absorbed the attention of main project management institutions such as Project Management Institute (PMI) and Australian institute of Project management (AIPM). These professional project management institutes have developed project managers’ comp...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید