نتایج جستجو برای: Advance rate

تعداد نتایج: 1016851  

خواجه پور, محمد رضا, رضایی, عبد المجید , سلطانی, افشین ,

Identification of easily measured physiological traits contributing to yield under specified environmental conditions would benefit genotypic selection for grain sorghum. A field experiment was conducted to determine broad-sense heritability and expected genetic advance, and to examine the relationships of grain yield with 11 physiological traits related to developmental periods, vegetative gro...

ژورنال: علوم آب و خاک 2001
خواجه پور, محمد رضا, رضایی, عبد المجید , سلطانی, افشین ,

Identification of easily measured physiological traits contributing to yield under specified environmental conditions would benefit genotypic selection for grain sorghum. A field experiment was conducted to determine broad-sense heritability and expected genetic advance, and to examine the relationships of grain yield with 11 physiological traits related to developmental periods, vegetative gro...

One of the main challenges faced in design and construction phases of tunneling projects is the determination of maximum allowable advance step to maximize excavation rate and reduce project delivery time. Considering the complexity of determining this factor and unexpected risks associated with inappropriate determination of that, it is necessary to employ a method which is capable of accounti...

Successful application of a TBM in a project requires investigating both the ground conditions and the machine and backup system design features. Prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. In this respect, both penetration rate and advance rate must be estimated. Utilization factor, which depends on the type of op...

The study of downtime and subsequently machine utilization in a given project is one of the major requirements of an accurate estimation of TBM performance and daily advance rate. Interestingly, while it is very common to report the components of downtime when discussing a tunneling project in the literature; there has not been a great amount of in-depth studies on this topic in the recent year...

Journal: :journal of mining and environment 2012
omid frough seyed rahman torabi majid tajik

successful application of a tbm in a project requires investigating both the ground conditions and the machine and backup system design features. prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. in this respect, both penetration rate and advance rate must be estimated. utilization factor, which depends on the type of op...

2008
G. Anagnostou

We investigate numerically the evolution of surface settlement during continuous tunnel excavation by formulating and solving the poro-elasticity equations in a frame of reference, which is fixed to the moving face. In tunnelling through low-permeability soils, consolidation processes take place in general simultaneously with the spatial stress redistribution in the vicinity of the advancing fa...

2003
Siwei Ma Wen Gao Peng Gao Yan Lu

Rate control plays a very important role in constant bit rate (CBR) coding. AVC standard is jointly developed by ISO and ITU-T, which contains several inter and intra prediction modes. Rate distortion optimization (RDO) based on prerequisite quantization parameters determines the optimal prediction of each macroblock. This makes the current AVC software difficult to adopt the existing rate cont...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید