نتایج جستجو برای: total earliness and tardiness

تعداد نتایج: 16875967  

2002
Ghaith Rabadi Georgios Anagnostopoulos Mansooreh Mollaghasemi

The problem of scheduling n jobs with a large common due date on a single machine is addressed. The objective is to minimize the jobs’ total earliness and tardiness. In this paper, sequence-dependent setup times are considered, which makes the problem NP-Hard. Therefore, exact algorithms are very unlikely to optimally solve large problems within reasonable computational time. A Simulated Anneal...

2005
Francis Sourd Safia Kedad-Sidhoum

This paper addresses the one-machine scheduling problem with earliness-tardiness penalties. We propose a new branch-and-bound algorithm that can solve instances with up to 50 jobs and that can solve problems with even more general non-convex cost functions. The algorithm is based on the combination of a Lagrangean relaxation of resource constraints and new dominance rules.

2014
A. JANIAK W. JANIAK M. Y. KOVALYOV

A fully polynomial time approximation scheme (FPTAS) with run time O( n m εm−1 ) is developed for a problem which combines common due window assignment and scheduling n jobs on m identical parallel machines. The problem criterion is bottleneck (min-max) such that the maximum cost, which includes job earliness, job tardiness and due window size costs, is minimized.

2002
Kerem Bülbül Philip Kaminsky Candace Yano

We consider a single machine earliness/tardiness scheduling problem with general weights, ready times and due dates. Using completion time information obtained from the optimal solution to a preemptive relaxation, we generate feasible solutions to the original non-preemptive problem. We report extensive computational results demonstrating the speed and effectiveness of this approach.

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Journal: :CoRR 2014
Bo Cheng Ling Cheng

In this paper, we consider the slack due-window assignment model and study a single machine scheduling problem of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. The cost for each job consists of four components: earliness, tardiness, window location and window size. The objective is to schedule the jobs and to assign the maintenance activity and due-windows s...

Journal: :Oper. Res. Lett. 1997
S. T. Webster

Family scheduling problems are characterized by a setup time structure where setups are only required between jobs from different families. We consider the problem of scheduling job families on parallel machines to minimize weighted deviation about a common due date. Various special cases of this problem have been considered in the literature. This note summarizes known complexity results and i...

Journal: :JORS 2010
Gur Mosheiov Jeffrey B. Sidney

We study a problem of scheduling a maintenance activity on a single machine. Following several recent papers, the maintenance is assumed to be deteriorating, that is, delaying the maintenance increases the time required to perform it. The following objective functions are considered: makespan, flowtime, maximum lateness, total earliness, tardiness and due-date cost, and number of tardy jobs. We...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید