This study built a simple, linear, four or fivecell production line model using the SIMAN/ Arena modeling tool. We used information from a case study of a real-world production line, augmented, as necessary, with details of machine operating characteristics not available in the original case study. The model was created in five variants: Traditional, JIT without kanban, JIT with kanban, TOC app...