Field studies were carried out on the earthen dam of channel reservoir Tuyamuyun hydrosystem Amudarya River (Uzbekistan), which was put into operation in 1984 according to traditional method using control and measuring equipment embedded body dam. The water levels upper lower reaches, piezometers, drainage discharge measured. Maximal 130.00 head race observed middle October minimal 117.00 March...