نتایج جستجو برای: flexiblejob shop scheduling

تعداد نتایج: 75061  

2012
ARASH BAYAT

This paper addresses the open shop scheduling problem. this problem, due to its complexity, is ranked in the class of NPhard problems. In this case, traditional approaches cannot reach to an optimal solution in a reasonable time. So heuristic algorithms such as simulated Annealing (SA), tabu search (TS) genetic algorithm, (GA), ant colony optimization (ACO) used to solve optimization problems s...

2007
V. Vinod R. Sridharan

This paper presents the salient aspects of a simulation-based experimental study of scheduling rules for scheduling a dynamic job shop in which the setup times are sequence dependent. A discrete event simulation model of the job shop system is developed for the purpose of experimentation. Seven scheduling rules from the literature are incorporated in the simulation model. Five new setup-oriente...

2016
R. Rajkumar

The job shop scheduling problem (JSSP) has attracted much attention in the field of both information sciences and operations research. This paper considers the permutation Job shop scheduling problem with the objective of minimizing make span. Artificial Bee Colony algorithm (ABC) is one of the search heuristics used to solve global optimization problems in complex search spaces. It is observed...

2014
Koji Teramoto

This study aims to investigate characteristics of job-shop scheduling methods for micro-enterprise. Many scheduling methods have been proposed and evaluated. However, most of evaluations are not focused on application for micro-enterprise. In order to figure out an appropriate scheduling method for micro-enterprise, job-shop scheduling methods are evaluated from the view of applicability for mi...

Today, the flow shop environment is the most customary production area in industry. But, the need to increase the capacity or the capacity balance in different production processes has caused that in some working stations there exists more than one machine. This type of flow shops are usually named hybrid flow shop, multi processes flow shop, flexible flow shop or flow shop with parallel machin...

2013
Neelesh Kumar Sharma

Flexible job-shop scheduling problem (FJSSP) is an extension of the classical job-shop scheduling problem that allows an operation to be processed by any machine from a given set along different routes. It is very important in both fields of production management and combinatorial optimisation. This paper presents a new approach based on attribute oriented mining technique to solve the multi-ob...

Journal: :Expert Syst. Appl. 2010
Tsung-Lieh Lin Shi-Jinn Horng Tzong-Wann Kao Yuan-Hsin Chen Ray-Shine Run Rong-Jian Chen Jui-Lin Lai I-Hong Kuo

The job-shop scheduling problem has attracted many researchers’ attention in the past few decades, and many algorithms based on heuristic algorithms, genetic algorithms, and particle swarm optimization algorithms have been presented to solve it, respectively. Unfortunately, their results have not been satisfied at all yet. In this paper, a new hybrid swarm intelligence algorithm consists of par...

Journal: :Algorithms 2015
Kong Lu Li Ting Keming Wang Hanbing Zhu Takano Makoto Yu Bin

The flexible job shop scheduling problem is a well-known combinatorial optimization problem. This paper proposes an improved shuffled frog-leaping algorithm to solve the flexible job shop scheduling problem. The algorithm possesses an adjustment sequence to design the strategy of local searching and an extremal optimization in information exchange. The computational result shows that the propos...

1989
E. TAILLARD

In this paper, we propose 260 scheduling problems whose size is greater than that of the rare examples published. Such sizes correspond to real dimensions of industrial problems. The types of problems that we propose are : the permutation flow shop, the job shop and the open shop scheduling problems. We restrict us to basic problems : the processing times are fixed, there are neither set-up tim...

2010
Vladimír Modrák R. Sudhakara Pandian

In a shop floor of the industry, the routings which are based upon the jobs that need to be processed on different machines are one among the major activities and therefore the resource requirements are not based upon the quantity as in a flow shop but rather the routings for the products being produced. However, both job shop and flow shop production cope with a scheduling problem to find a fe...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید