نتایج جستجو برای: concrete dam
تعداد نتایج: 88416 فیلتر نتایج به سال:
in the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. in this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. the concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...
Concrete faced rockfill dams (CFRDs) are among the structures that due to their advantages such ease of construction and low execution costs,have attracted more attention nowadays.Due to the fact that during large earthquakes,the hydrodynamic pressure will be large and cannot be ignored,the main purpose of this research is to apply reservoir hydrodynamic pressure of dam reservoir caused by the ...
Usually, dam monitoring systems are based on both boundary conditions (temperature, rainfall, water level, etc.) and structural responses (displacements, rotations, pore pressures, etc.). Statistical analysis tools are widely used to compare the current response of the dam with a whole set of recorded data, in order to determine eventual unwanted behaviors. The main drawback of this approach is...
On 26 May 2003, intense rainfall from a series of thunderstorms in eastern North Carolina caused flooding that eventually destroyed the concrete dam in Hope Mills, draining Hope Mills Lake, and revealing a formerly submerged and buried structure that was identified as a timber crib dam. Inspection revealed these logs to be old-growth longleaf pines, which are now rare on the coastal plain lands...
After the Wenchuan earthquake in 2008, the Zipingpu concrete faced rockfill dam (CFRD) was found slabs dislocation between different stages slabs and the maximum value reached 17 cm. This is a new damage pattern and did not occur in previous seismic damage investigation. Slabs dislocation will affect the seepage control system of the CFRD gravely and even the safety of the dam. Therefore, inves...
This work is a contrastive investigation of numerical simulations to improve the comprehension of thermo-structural coupled phenomena of mass concrete structures during construction. The finite element (FE) analysis of thermo-structural behaviors is used to investigate the applicability of supersulfated cement (SSC) in mass concrete structures. A multi-scale framework based on a homogenization ...
A sodium silicate-based chemical grout was used in the Karkheh dam site in order to examine the performance of the chemical grouting technique for stabilization of the dam's filter material. Karkheh, an embankment dam with the reservoir capacity of about 7.4 billion cubic meter at the maximum water level, is the largest dam in Iran. The grouting works performed at the dam site, were part of the...
The First Cut- off Wall in the Indian Himalayas for the Dam of the Dhauliganga Hydroelectric Project
In the far north of Uttar Pradesh Province in the Indian Himalayas; the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation ( NHPC ), a stateowned enterprise; and a joint venture of Kajima Corporation of Tokyo and Daewoo Corporation of Seoul. This project sets out to develop the lower section of the mountain cascade of the Dhauliganga r...
Settlement is one of the most important deformation characteristics of high concrete faced rockfill dams (CFRDs, >100 m). High CFRDs safety would pose a great threat to the security of people’s lives and property downstream if this kind of deformation were not to be measured correctly, as traditional monitoring approaches have limitations in terms of durability, coverage, and efficiency. It has...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید