نتایج جستجو برای: total earliness and tardiness

تعداد نتایج: 16875967  

Journal: :Computers & OR 2005
Jorge M. S. Valente Rui A. F. S. Alves

In this paper, we consider the single machine earliness/tardiness scheduling problem with di/erent release dates and no unforced idle time. The problem is decomposed into weighted earliness and weighted tardiness subproblems. Lower bounding procedures are proposed for each of these subproblems, and the lower bound for the original problem is the sum of the lower bounds for the two subproblems. ...

1998
D - H Lee Y - D Kim

We consider a multi-period order selection problem in ̄exible manufacturing systems, which is the problem of selecting orders to be produced in each period during the upcoming planning horizon with the objective of minimising earliness and tardiness costs and subcontracting costs. The earliness and tardiness costs are incurred if an order is not ®nished on time, while subcontracting cost is incu...

Journal: :journal of optimization in industrial engineering 0
behrouz afshar nadjafi department of industrial engineering, islamic azad university of qazvin, qazvin, iran, shahram shadrokh department of industrial engineering, sharif university of technology, tehran, iran,

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Journal: :International Journal of Production Research 2009

2015
Ashwani Kumar Dhingra

In the present work, an industrial case study has been considered for multi-objective flow shop scheduling problem including the sequence dependent set up time. The multi-objectives include the minimization of sum of total weighted squared tardiness, total weighted squared earliness, makespan and number of tardy jobs. Industries can select the optimal sequence with respect to required objective...

Journal: :journal of optimization in industrial engineering 2010
behrouz afshar nadjafi shahram shadrokh

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

2014
M. Berke Pamay Kerem Bülbül Gündüz Ulusoy

In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided. In DRCMPSPWET, a project arrives on top of an existing project portfolio and a due date has to be quoted for the new project while keeping the costs related to changes in the sc...

Journal: :Journal of the Operational Research Society 2010

2013
R. Tavakkoli-Moghaddam H. Amin-Tahmasbi

We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is specially ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید