This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...

Fakhouri, Pasha , Kazemi, Abolfazl ,

Project scheduling is one of the main fundamentals in project management so the related progressive methods which consider most of the project limitations would be valuable. The GERT (Graphical Evaluation and Review Technique) is a network analysis method which has unique capabilities in comparison with other conventional scheduling methods. On the other hand and, there is no definite conformit...

2012
Zahra Zare Abdulreza Naddaf Maysam Ashrafzadeh Mohammad Reza Salehi

Preemption in multi-mode Resource-constrained project scheduling problem Zahra Zare* Department of Industrial Engineering Najafabad Branch, Islamic Azad University, Isfahan, Iran Postal Code: 71767-13763, Unit 3, No 142, 6 Alley, South Bahonar St., Shiraz, Iran Abdulreza Naddaf Department of Management Shiraz University, Shiraz, Iran Maysam Ashrafzadeh Department of Industrial Engineering Najaf...

Journal: :journal of industrial engineering and management studies 0
f. molavi sadjad university of technology, mashhad, iran. e. rezaee nik sadjad university of technology, mashhad, iran.

resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...