نتایج جستجو برای: hybrid flowshop

تعداد نتایج: 191422  

2013
M. K. Marichelvam M. Geetha

The problem of m-machine permutation flowshop scheduling is considered in this paper. The objective is to minimize the makespan. The flowshop scheduling problem is a typical combinatorial optimization problem and has been proved to be strongly NP-hard. Hence, several heuristics and meta-heuristics were addressed by the researchers. In this paper, a discrete African wild dog algorithm is applied...

Journal: :Processes 2023

In this paper, we address a two-stage hybrid flowshop scheduling problem with identical parallel machines in each stage. The assumes that the queue (Q)-time for job, which represents waiting time to be processed current stage, must limited predetermined threshold due quality concerns final product. This is motivated by one occurs real field, especially diffusion workstation of semiconductor fab...

Journal: :Applied Mathematics and Computation 2010
Li-Man Liao Ching-Jen Huang

This paper deals with the non-permutation flowshop problem which means that the job sequences are allowed to be different on machines. The objective function is minimizing the total tardiness. Firstly, three mixed-integer linear programming (MILP) models for non-permutation flowshop problems are described, and then are analyzed and assessed their relative effectiveness. Secondly, two Tabu searc...

2015
Mageed A. Ghaleb Ibrahim M. Alharkan

The issue of sequencing and scheduling has received considerable critical attention in many fields since the early 1950s. In this research, we studied an important production scheduling system, which generally called flexible (or hybrid) flowshop scheduling problem (FFSP or HFSP). We studied this production system with an important restriction called the no-wait. The objective was to optimize t...

Journal: :Annals OR 2012
Martín Gómez Ravetti Carlos Riveros Alexandre Mendes Mauricio G. C. Resende Panos M. Pardalos

This paper addresses the Permutation Flowshop Problem with minimization of makespan, which is denoted by F |prmu|Cmax . In the permutational scenario, the sequence of jobs has to remain the same in all machines. The Flowshop Problem (FSP) is known to be NP-hard when more than three machines are considered. Thus, for medium and large scale instances, highquality heuristics are needed to find goo...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید