نتایج جستجو برای: earthwork optimization
تعداد نتایج: 318324 فیلتر نتایج به سال:
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
Usually, selection of a highway alignment depends on an economical route that minimizes alignment sensitive costs, such as construction cost, user cost, right-of-way cost, and earthwork cost. Most of the available highway alignment optimization algorithms do not consider traffic assignment and distribution of traffic as a result of the new road network consisting of the new alignment as well as...
Forest roads, as a prerequisite for high-quality forest management, should be optimally distributed in order to avoid negative environmental impacts and best fulfill their task. In the design phase of it is necessary know which factors influence most volume earthworks enable designer adapt terrain requirements. this paper impact an average cross slope carriageway value road on cut fill analyzed...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید