نتایج جستجو برای: commissioning beam

تعداد نتایج: 116791  

2017
Chaeyeong Lee Sangmin Lee Seung-Jae Lee Hankyeol Song Dae-Hyun Kim Sungkoo Cho Kwanghyun Jo Youngyih Han Yong Hyun Chung Jin Sung Kim

Proton therapy is a rapidly progressing field for cancer treatment. Globally, many proton therapy facilities are being commissioned or under construction. Secondary neutrons are an important issue during the commissioning process of a proton therapy facility. The purpose of this study is to model and validate scanning nozzles of proton therapy at Samsung Medical Center (SMC) by Monte Carlo simu...

Journal: :International Journal of Medical Sciences 2004
Joseph A. Both Todd Pawlicki

This work is a report on the commissioning of low energy electron beams of a medical linear accelerator for Monte Carlo dose calculation using NXEGS software (NXEGS version 1.0.10.0, NX Medical Software, LLC). A unique feature of NXEGS is automated commissioning, a process whereby a combination of analytic and Monte Carlo methods generates beam models from dosimetric data collected in a water p...

Journal: :Nuclear Instruments and Methods in Physics Research 2021

In the rapid cycling synchrotron of China Spallation Neutron Source, anti-correlated painting was adopted for design scheme injection system. beam commissioning, with optimization painting,the loss has been well controlled and efficiency exceeded 99%. Combined other aspects adjustments, power on target reached 50 kW smoothly. this paper, we have studied in commissioning. Compared to simulation ...

2012
Benjamin Cheymol Enrico Bravin

LINAC4 is part of the CERN Large Hadron Collider injector chain upgrade (LIU) and will accelerate H− ions from 45 keV to 160 MeV, it will be the first step of the upgrade with the replacement of LINAC2 in 2018. In order to measure beam profiles along the LINAC, several SEM grid and wire beam scanner (WS) monitors will be installed between the RF cavities from 50 MeV to 160 MeV. This thesis cove...

2010
H. Oguri Y. Namekawa K. Ohkoshi A. Ueno

A cesium-free negative hydrogen ion source driven with a LaB6 filament is being operated for J-PARC. The beam commissioning of J-PARC accelerators started in November 2006. As of June 2010, there have been 34 beam commissioning or supply runs. In these runs, the ion source has been successfully operated in two different modes such as low current mode of 5 mA and high current mode of 30 mA. Acco...

2000
George Starkschall Roy E. Steadham Richard A. Popple Salahuddin Ahmad Isaac I. Rosen

Commissioning beam data for the convolution/superposition dose-calculation algorithm used in a commercial three-dimensional radiation treatment planning (3D RTP) system (PINNACLE(3), ADAC Laboratories, Milpitas, CA) can be difficult and time consuming. Sixteen adjustable parameters, as well as spectral weights representing a discrete energy spectrum, must be fit to sets of central-axis depth do...

2012
G. J. Müller X. Buffat K. Fuchsberger M. Giovannozzi S. Redaelli

The control of high intensity beams in a high energy, superconducting machine with complex optics like the CERN Large Hadron Collider (LHC) is challenging not only from the design aspect but also for operation towards physics production. To support the LHC beam commissioning, efforts were devoted in the design and implementation of a software infrastructure aimed at using the computing power of...

Journal: :Journal of Physics: Conference Series 2020

2010
V. Ptitsyn A. Marusic

Slow variations of the RHIC closed orbit have been strongly influenced by diurnal variations. These variations affect the reproducibility of RHIC operation and might have contributed to proton beam polarization degradation during past polarized proton runs. We have developed and commissioned a slow orbit feedback system in RHIC Run-10 to diminish these variations and improve energy ramp commiss...

Journal: :International Journal of Medical Physics, Clinical Engineering and Radiation Oncology 2016

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید