نتایج جستجو برای: stage stochastic programming

تعداد نتایج: 787292  

2004
Andres Barbaro Miguel J. Bagajewicz

A methodology is presented to include financial risk management in the framework of two-stage stochastic programming for planning under uncertainty. A known probabilistic definition of financial risk is adapted to be used in this framework and its relation to downside risk is analyzed. Using these definitions, new two-stage stochastic programming models that manage financial risk are presented....

2006
Gonzalo Guillén Antonio Espuña Luis Puigjaner

A multistage stochastic optimization model is presented to address the scheduling of supply chains with embedded multipurpose batch chemical plants under demand uncertainty. In order to overcome the numerical difficulties associated with the resulting large-scale stochastic mixed-integer-linear-programming (MILP) problem, an approximation strategy comprising two steps, and based on the resoluti...

Journal: :Math. Program. 2016
Xiao Liu Simge Küçükyavuz James R. Luedtke

We study a class of chance-constrained two-stage stochastic optimization problems where second-stage feasible recourse decisions incur additional cost. In addition, we propose a new model, where “recovery” decisions are made for the infeasible scenarios to obtain feasible solutions to a relaxed second-stage problem. We develop decomposition algorithms with specialized optimality and feasibility...

Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...

Journal: :SICE Journal of Control, Measurement, and System Integration 2017

Ahmad Sadegheih Mohammad Saber Fallah Nezhad Seyed Taghi Akhavan Niaki,

In this paper, the single machine replacement problem is being modeled into the frameworks of stochastic dynamic programming and control threshold policy, where some properties of the optimal values of the control thresholds are derived. Using these properties and by minimizing a cost function, the optimal values of two control thresholds for the time between productions of two successive nonco...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید