Journal: :J. Math. Model. Algorithms 2013
Emna Dhouib Jacques Teghem Taïcir Loukil

This paper studies the permutation flowshop scheduling problem with sequence dependent setup times and time lags constraints minimizing the number of tardy jobs. Dependent setup times are defined as the work to prepare the machines between two successive jobs. Time lags are defined as intervals of time that must exist between every couple of successive operations of the same job. Two mathematic...

1997
Shyh-Chang Lin Erik D. Goodman William F. Punch

This paper describes a genetic algorithm approach to the dynamic job shop scheduling problem with jobs arriving continually. Both deterministic and stochastic models of the dynamic problem were investigated. The objective functions examined were weighted flow time, maximum tardiness, weighted tardiness, weighted lateness, weighted number of tardy jobs, and weighted earliness plus weighted tardi...

Journal: :Mathematics 2023

We consider the scheduling of jobs with multiple weights on a single machine for minimizing total weighted number tardy jobs. In this setting, each job has m (or equivalently, have weighting vectors), and thus we criteria, which is to minimize under corresponding vector For model, feasibility problem aims find feasible schedule such that criterion upper bounded by its threshold value, Pareto al...

2014
Chuan-Li Zhao Chou-Jung Hsu Hua-Feng Hsu

This paper considers single machine scheduling and due date assignment with setup time. The setup time is proportional to the length of the already processed jobs; that is, the setup time is past-sequence-dependent (p-s-d). It is assumed that a job's processing time depends on its position in a sequence. The objective functions include total earliness, the weighted number of tardy jobs, and the...

2015
Pankaj Sharma Ajai Jain

Stochastic dynamic job shop scheduling problem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatching rules in such shop from makespan, mean flow time, maximum flow time, mean tardiness, maximum tardiness, number of tardy jobs, total setups and mean setup time performance measures ...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه علامه طباطبایی - دانشکده ادبیات و زبانهای خارجی 1387

the present study is an experimental case study which investigates the impacts, if any, of skopos on syntactic features of the target text. two test groups each consisting of 10 ma students translated a set of sentences selected from advertising texts in the operative and informative mode. the resulting target texts were then statistically analyzed in terms of the number of words, phrases, si...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه مازندران - دانشکده علوم انسانی و اجتماعی 1388

the present study set out (a) to examine the categories of pedagogical knowledge related to the act of teaching of novice and experienced teachers as gleaned from their verbal report of what they were thinking about while teaching and (b) to compare the categories of pedagogical knowledge of novice and experienced teachers. the aim of comparing these two groups of teachers was to see whether di...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه شهید باهنر کرمان - دانشکده ادبیات و علوم انسانی 1389

abstract this research has been carried out with the purpose of investigating the conditions and related elements of the employment of the educational sciences graduates of hamedan province universities in 1382-1387 academic years. it has been a descriptive research of a correlation kind, and the population number has been 1180 grduates of payam- e noor universites in asad – abaad, kaboudaraha...

2013
I-Lin Wang Yi-Chi Wang Chih-Wei Chen

We investigate a difficult scheduling problem in a semiconductor manufacturing process that seeks to minimize the number of tardy jobs and makespan with sequence-dependent setup time, release time, due dates and tool constraints. We propose a mixed integer programming (MIP) formulation which treats tardy jobs as soft constraints so that our objective seeks the minimum weighted sum of makespan a...

Journal: :Annals OR 2008
Sanja Petrovic Carole Fayad Dobrila Petrovic Edmund K. Burke Graham Kendall

This paper deals with a problem of determining lot-sizes of jobs in a real-world job shop-scheduling in the presence of uncertainty. The main issue discussed in this paper is lot-sizing of jobs. A fuzzy rule-based system is developed which determines the size of lots using the following premise variables: size of the job, the static slack of the job, workload on the shop floor, and the priority...