Journal: :IFAC-PapersOnLine 2021

In this study, we consider a particular version of the hybrid flexible flow shop (HFFS) scheduling problem, inspired from real-life application in printing industry. The considered problem is variation classical Flow which specific constraints are jointly considered, such as non-identical parallel machines, sequence-dependent setups on machine eligibility, and precedence among jobs, order to mi...

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

Journal: :Annals OR 2013
Lixin Tang Wei Jiang Georgios K. D. Saharidis

We investigate a logistics facility location problem to determine whether the existing facilities remain open or not, what the expansion size of the open facilities should be and which potential facilities should be selected. The problem is formulated as a mixed integer linear programming model (MILP) with the objective to minimize the sum of the savings from closing the existing facilities, th...

Amin-Tahmasbi, Tavakkoli-Moghaddam,

 We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...

Journal: :Journal of Physical Oceanography 2001

Journal: :IISE transactions 2022

We consider an uncapacitated lot-sizing problem in co-production systems, which it is possible to produce multiple items simultaneously a single production run. Each product has deterministic demand be satisfied on time. The decision choose co-produce and the amount of throughout predetermined planning horizon. show that with strongly NP-Hard. Then, we develop various Mixed-Integer Linear Progr...

2006
Edward F. Stafford Fan T. Tseng

This paper presents an MILP model for the permutation flowshop wherein the setup times are both separable from the job processing times and independent of a job’s position in the processing sequence. Two experiments were conducted to estimate the computer times necessary to solve problems with up to 9 machines and 15 jobs, and to then compare these solution time requirements to those required ...

Journal: :Computers & OR 2015
Céline Gicquel Michel Minoux

We consider a problem arising in the context of industrial production planning, namely the multi-product discrete lot-sizing and scheduling problem with sequence-dependent changeover costs. We aim at developing an exact solution approach based on a Cut & Branch procedure for this combinatorial optimization problem. To achieve this, we propose a new family of multi-product valid inequalities whi...

Journal: :Rairo-operations Research 2021

Nowadays many industry consider an interval time as a due date instead of precise points in time. In this study, the hybrid flow shop scheduling problem with basic blocking constraint is tackled. Where jobs, if done within window, are deemed on Therefore, criterion to minimize sum weighted earliness and tardiness. This variant flowshop not investigated best our knowledge. we introduced new meta...