Journal: :European Journal of Operational Research 2006
Saral Mukherjee Ashis Kumar Chatterjee

The Shifting Bottleneck (SB) heuristic is among the most successful approximation methods for solving the Job Shop problem. It is essentially a machine based decomposition procedure where a series of One Machine Sequencing Problems (OMSPs) are solved. However, such a procedure has been reported to be highly ineffective for the Flow Shop problems (Jain and Meeran 2002). In particular, we show th...

2015
Maria Elena Nenni Yuyue Song Laurence A. Wolsey

Lot sizing and scheduling in flow shop has been considered in this paper. Our study includes a multi-level and multi-period capacitated lot sizing and scheduling problem (CLSP) with sequence-dependent setups, setups carry over in flow shop. In manufacturing environments backlogging is unavoidable. If the production capacity is infinite, any demand can be satisfied

2012
Ahmad Rabanimotlagh

In this paper an ant colony optimization algorithm is developed to solve the permutation flow shop scheduling problem. In the permutation flow shop scheduling problem which has been vastly studied in the literature, there are a set of machines and a set of jobs. All the jobs are processed on all the machines and the sequence of jobs being processed is the same on all the machines. Here this pro...

Journal: :European Journal of Operational Research 2003
Michel Gourgand Nathalie Grangeon Sylvie Norre

This paper deals with performance evaluation and scheduling problems in m machine stochastic flow shop with unlimited buffers. The processing time of each job on each machine is a random variable exponentially distributed with a known rate. We consider permutation flow shop. The objective is to find a job schedule which minimizes the expected makespan. A classification of works about stochastic...

Journal: :نشریه دانشکده فنی 0
رضا برادران کاظم زاده سیدحسام الدین ذگردی محمدعلی بهشتی نیا

this study considers scheduling in hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. this problem does not study in the literature, so far. flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. after mode...

2011
Glenn A. Metts Charles H. Apigian

Smaller production companies, such as job shops, are often incapable of committing significant human or capital resources for the improvement of manufacturing flow times. However, there is considerable demand in these organizations for solutions that offer improvements without the risk involved in expending these resources. This paper investigates the impact of scheduling rules and reorganizati...

1992
Riccardo Bettati Jane W.-S. Liu

In a distributed system or communication network tasks may need to be executed on more than one processor. For time-critical tasks, the timing constraints are typically given as end-to-end release-times and deadlines. This paper describes algorithms to schedule a class of systems where all the tasks execute on different processors in turn in the same order. This end-to-end scheduling problem is...

2002
Amet H.

We are interested here in new sub cases for which permutation flow shop schedules are dominant while considering the classical flow shop scheduling problem and the makespan criterion. To obtain these sub cases, we introduce conditions on the lower and upper bounds of the processing times. These conditions can be quite realistic when the corresponding line is balanced.

Journal: :Computers & OR 1996
John K. Karlof Wei Wang

A two level branch and bound algorithm is developed to solve an altered form of the standard flow-shop scheduling problem modeled as a bilevel programming problem. The flow-shop scheduling problem considered here differs from the standard problem in that operators are assigned to the machines and each operator has a different time table for the jobs on each machine. The shop owner is considered...

Journal: :journal of quality engineering and production optimization 2015
sahar tadayoni rad saiedeh gholami rasoul shafaei hany seidgar

this paper considers a two-stage assembly flow shop problem (tafsp) where m machines are in the first stage and an assembly machine is in the second stage. the objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. jit seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...