the research on project scheduling has widely expanded over the last few decades. the vast majority of these research efforts focus on exact and suboptimal procedures for constructing a workable schedule, assuming complete information and a static deterministic problem environment. project activities are scheduled subject to both technological precedence constraints and resource constraints, mo...
PREFACE After having received my diploma from the Technische Universität Berlin in 1996, Rolf Möhring, the supervisor of my diploma thesis, offered me a research position in his group. At that time I was employed at a Berlin software company the head of which, Gert Scheschonk, strongly encouraged me to accept the offer. I accepted and in 1997 I began to work within a research initiative funded ...
Discrete time-cost tradeoff model for optimizing multi-mode construction project resource allocation
The project scheduling and resource allocation problems have been studied using different optimization methods. The resource leveling problem was proposed to reduce the resource fluctuation and was always studied independently resource constraint problem. For example, resource-constrained project scheduling problem (RCPSP) was proposed to optimize scheduling under resource constraints. This res...
This paper addresses the problem of scheduling jobs in soft real-time systems, where the utility of completing each job decreases over time. We present a utility-based framework for making repeated scheduling decisions based on dynamically observed information about unscheduled jobs and system’s resources. This framework generalizes the standard scheduling problem to a resource-constrained envi...
In this paper, we present a new topic in connection with project scheduling. Since a limited work space can form a restriction to project scheduling problems, an efficient usage of these work spaces (or so-called spatial resources) is required to produce good project schedules. The requirement for the resource units of these spatial resources is in an adjacent manner (we cannot place a product ...
In the real world, projects are subject to numerous uncertainties at different levels of planning. Fuzzy project scheduling is one of the approaches that deal with uncertainties in project scheduling problem. In this paper, we provide a new technique that keeps uncertainty at all steps of the modelling and solving procedure by considering a fuzzy modelling of the workload inspired from the fuzz...
Construction projects are planned in a complex and dynamic environment characterized by high risks uncertainties amidst resource constraints. Assessing construction schedule risk facilitates informed decision-making, especially resource-constrained situation, allows proactive actions to be taken so that project objectives not jeopardized. This study presents stochastic multiskilled scheduling (...