نتایج جستجو برای: assembly line

تعداد نتایج: 532473  

F. Mokhatab Rafiei and G. Moslehi, M. Aghdasi,

This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...

Journal: :International Journal for Research in Applied Science and Engineering Technology 2018

and M.A. Beheshti, M. Rabbani, R. Tavakkoli-Moghaddam,

This paper presents a nonlinear mixed-integer programming model to minimize the stoppage cost of mixed-model assembly lines. Nowadays, most manufacturing firms employ this type of line due to the increasing varieties of products in their attempts to quickly respond to diversified customer demands. Advancement of new technologies, competitiveness, diversification of products, and large customer ...

This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...

Background: Work-related musculoskeletal disorders (WMSDs) may involve all parts of the body, and have been a worldwide problem. Employed women are two to five times more likely to report such problems, and assembly lines suspected to induce more WMSDs because of high rate of repetitive motions. Methods: The aim of this study to determine the prevalence of WMSDs in women workers of an automobi...

Journal: :Mechanical Engineering 1999

Journal: :Journal of Industrial Engineering International 2017

Journal: :ACS Chemical Biology 2008

2013
T. M. Rangaswamy

Line balancing is an effective tool to improve the throughput of assembly line while reducing nonvalue-added activities, cycle time. LB is the problem of assigning operation to workstation along an assembly line, in such a way that assignment is optimal in some sense. This paper mainly focuses on improving overall efficiency of single model assembly line by reducing the non value added activiti...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید