In this paper, we propose n-jobs to be processed on Single Machine Scheduling Problem (SMSP) involving fuzzy processing time and fuzzy due dates. The different due dates for each job be considered which meet the demand of customer with more satisfaction level. The main objective of this paper is the total penalty cost to be minimum in the schedule of the jobs on the single machine. This cost is...
Nowadays, scheduling problems have a considerable application in production and service systems. In this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. In many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combin...
We address the single-machine stochastic scheduling problem with an objective of minimizing total expected earliness and tardiness costs, assuming that processing times follow normal distributions and due dates are decisions. We develop a branch and bound algorithm to find optimal solutions to this problem and report the results of computational experiments. We also test some heuristic procedur...
We study multitasking scheduling and due-window assignment problems in a single machine, which can be found various application domains. In environment, unfinished job always interrupts in-processing job. common due window assignment, the aim is to find optimal minimise value of earliness tardiness penalty. this paper, we two problems, where objective first problem earliness, tardiness, startin...
this paper considers a two-stage assembly flow shop problem (tafsp) where m machines are in the first stage and an assembly machine is in the second stage. the objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. jit seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...
We consider a queueing facility where customers decide when to arrive. All customers have the same desired arrival time (w.l.o.g. time zero). There is one server, and the service times are independent and exponentially distributed. The total number of customers that demand service is random, and follows the Poisson distribution. Each customer wishes to minimize the sum of three costs: earliness...
In this paper, we study a resource-constrained project scheduling problem in which a set of project activities have due dates. If the finish time of each one of these activities is not equal to its due date, an earliness or a tardiness cost exists for each tardy or early period. The objective is to minimize the sum of discounted weighted earliness-tardiness penalty costs of these activities. Sc...
This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...
In this paper we consider single machine scheduling problems with a common due-date for all jobs, arbitrary monotone earliness and tardiness costs and arbitrary breakdown and repair processes. We show that the problem is equivalent to a deterministic one without breakdowns and repairs and with an equivalent cost function of a job's completion time. A V-shaped schedule without idle times is show...