The concept of flexible manufacturing is highly appealing in gaining a competitive edge in the market by quickly adapting to the changing customer needs. Scheduling jobs on flexible manufacturing systems (FMSs) is a challenging task of managing the available flexibility on the shop floor to react to the dynamics of the environment in real-time. In this paper, an agent-oriented scheduling framew...
Real-time Scheduling of a Flexible Manufacturing System using a Two-phase Machine Learning Algorithm
The static and analytic scheduling approach is very difficult to follow and is not always applicable in real-time. Most of the scheduling algorithms are designed to be established in offline environment. However, we are challenged with three characteristics in real cases: First, problem data of jobs are not known in advance. Second, most of the shop’s parameters tend to be stochastic. Third, th...
The importance of multi-objective optimization is globably established nowadays. Furthermore, a great part of real-world problems are subject to uncertainties due to, e.g., noisy or approximated fitness function(s), varying parameters or dynamic environments. Moreover, although evolutionary algorithms are commonly used to solve multiobjective problems on the one hand and to solve stochastic pro...
Flexible manufacturing Systems are automated manufacturing systems which have job shop flexibility and flow shop efficiency. One of the major concerns in Flexible Manufacturing System (FMS) is the minimization of the total flow of material through the system. Facility layout design deals with the arrangement of machines, in order to minimise the total flow of parts in the system. The commonly u...
A flexible flow shop problem can be considered as a generalization of a pure flow shop problem in which the jobs have to go through the stages in the same order. We consider a flexible flow shop problem with unrelated machines and setup times, where the processing times depend on the chosen machine and setup times are sequence-dependent. While for classical problems the processing times for eac...
tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. hence, integration has been proposed to decide about these problems concurrently. main problem in integration is how we can relate pro...
In this paper a new approach is presented to solve multi-objective production scheduling and rescheduling problems. Furthermore the relationship between production goals and heuristic solving methods in an extended flexible flow shop environment is also investigated. We define production goals by specifying objective functions and apply special production constraints for the extended flow shop ...
This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to minimize the total tardiness time for t...