نتایج جستجو برای: pit and sculpture

تعداد نتایج: 16829570  

Journal: :journal of mining and environment 2012
ebrahim elahi reza kakaie amir yusefi

ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. a number of algorithms such as floating or moving cone method, floating cone method ii and the corrected forms of this method, the korobov algorithm and the corrected form of this method, dynamic programming and the lerchs and grossmann algorithm based on grap...

Ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. A number of algorithms such as floating or moving cone method, floating cone method II and the corrected forms of this method, the Korobov algorithm and the corrected form of this method, dynamic programming and the Lerchs and Grossmann algorithm based on grap...

Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....

River bed sand and gravel are utilized more than mountain materials due to their availability and closeness to the transit roads and sites of usage. Excessive and non-technical extraction of gravel and sand bring a kind of interference in them, leading to many negative consequences. Therefore, presenting solutions to reduce these impacts and infilling mining pits are essential. In this researc...

Sungun Copper Mine is located in an area with a high level of seismic hazard. Most recently, the Ahar-Varzeqan earthquake with a magnitude of 6.2 on Richter scale occurred on August 11, 2012; at a distance about 40 kilometers away from the mine. Nevertheless, the seismic stability of the final pit wall has not been comprehensively reviewed. In this research, the southwestern wall of the final p...

2002
Robert J. Krawczyk

In the development of a digital sculpture for a competition entry, a mathematical approach was investigated as a method to develop a variety of forms. This paper covers the initial inspiration for the sculpture, Georg Nees’s Gravel Stones, and then the series of approaches that were developed expanding the starting concept. Each step in the process is described including the decisions and alter...

Journal: :iran agricultural research 2012
s. ramezani a. shekafandeh

this study was carried out on olive trees cv. amygdalifolia, to investigate the effect of spraying potassium nitrate, kno3, and zinc sulfate, znso4, on the fruit weight, dimension and volume. the plants were sprayed with 0, 0.5, 1.0 and 1.5% kno3 and 0, 0.25, 0.50 and 0.75% znso4 and their combinations in august about halfway through the fruit growth period. the highest fruit weight was observe...

حسینی, سید محسن, محمدی, جهانگرد, کوج, یحیی,

  Tree uprooting creates multiple microsites that can be effective on soil heterogeneity. In order to investigate the soil features in pit and mound location, twenty hectare areas of Tarbiat Modares University Experimental Forest Station studied that is located in Mazandaran province, in the north of Iran. Numbers of thirty four uprooted trees were found in study areas. Five microsites were con...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید