The purpose of this study was to analyze the performance heavy equipment and duration time required complete Windo River Cliff Normalization Reinforcement Project, Pamandati Village, Laeya District, South Konawe Regency. results showed that excavator's in excavation work (mechanical) 38.68 m3/hour, dump truck 2.99 m3/hour. As for embankment imported from outside, excavator is 98.53 m3/hour 3.05...