نتایج جستجو برای: commissioning beam
تعداد نتایج: 116791 فیلتر نتایج به سال:
The control system based on the standard model of the UNIX and VMEbus system has successfully performed accelerator operation with 8GeV electron beams. The software architecture of the control system designed with the client/server scheme has well operated over the distributed computing environment with the FDDI opticalfiber network. The relational database system has been widely used for machi...
A model-bssed beam orbit simulation program has been used successfully to analyze the beam energy errors 'at the two-mile linear accelerator during commissioning of the SLC system. Thii simulation program has also been used to develop a nondestructive beam energy error monitoring system. The method of tUdyBi8, the simulation program, and a beam energy analysis and monitoring system using expert...
Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of the extraction channels and kicker performance derived from dilution sweep shapes are presented. The per...
The commissioning of the Orion laser facility at the Atomic Weapons Establishment (AWE) in the UK has recently been completed. The facility is a twelve beam Nd:glass-based system for studying high energy density physics. It consists of ten frequency-tripled beam-lines operating with nanosecond pulses, synchronized with two beam-lines with subpicosecond pulses, each capable of delivering 500 J t...
The aim of the latest CLIC test facility CTF3, built at CERN by an international collaboration, is to prove the main feasibility issues of the CLIC two-beam acceleration technology. Several of the main goals have been already achieved in the past years, like the full-loading linac operation mode and the delay loop principle. During 2008 also the combiner ring concept has been experimentally pro...
The ALICE experiment is designed to study strongly interacting nuclear matter which will be produced in heavy ion collisions at the Large Hadron Collider (LHC). The muon spectrometer of the ALICE experiment is equipped with a trigger system based on resistive plate chambers. A commissioning phase was started in 2008 with the detection of cosmic rays and induced particles of the first beam injec...
Beam Commissioning for the damping ring of the KEK accelerator test facility (ATF) has been started since January 1997. Control system of the ATF accelerator i s based on the CAMAC-enhanced byte-serial highways handled by the Open-VMS Cluster system. Control software is integrated by using a commercial database application for process control. In this paper we present the status of the ATF cont...
The Proton Engineering Frontier Project (PEFP) will install a 100-MeV proton linear accelerator at Gyeong-ju site. For the beam commissioning of 100 MeV proton linac, the two target rooms (TR 103, TR 23) will be prepared as a starter among 10 target room. To design the irradiation equipment in TR 103, we have investigated general propagation shape and spatial distribution of proton beam, when 1...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید