نتایج جستجو برای: periodic flexible maintenance planning random breakdown single machine setting simulation

تعداد نتایج: 2489312  

Journal: :international journal of industrial engineering and productional research- 0
kamyar sabri laghaie department of industrial engineering, iran university of science & technology, narmak, tehran, iran mohammad saidi mehrabad department of industrial engineering, iran university of science & technology, narmak, tehran, iran arash motaghedi larijani department of industrial engineering, iran university of science & technology, narmak, tehran, iran

in this paper a single server queuing production system is considered which is subject to gradual deterioration. the system is discussed under two different deteriorating conditions. a planning horizon is considered and server which is a d/m/1 queuing system is gradually deteriorates through time periods. a maintenance policy is taken into account whereby the server is restored to its initial c...

Journal: :International Journal of Computational Intelligence Systems 2020

  This paper considers the impact of inflation on the EPQ model for deteriorating items subject to random machine breakdowns and fixed maintenance period. The demand rate is assumed to be a function of inflation and the demand increase due to inflation. The objective is to determine the optimal production uptime that minimizes the present value of expected total costs per unit time consisting o...

2014
L. Mifdal Z. Hajej S. Dellagi

In this paper, we deal with the problem of maintenance planning and production planning for a multiple-product manufacturing system. The manufacturing system under consideration consists of one machine which is subject to random failures and produces several products in order to satisfy some random demands. At any given time, the machine can only produce one type of product. The purpose of this...

Journal: :Journal of Public Administration and Governance 2012

I Almanar I Azid R Ahmad S Kamaruddin

In industries, Preventive Maintenance (PM) is not a new practice to minimise the sudden breakdown of production machine. PM will be performed at predetermine intervals to provide a balance between failure cost and component utilisation (aging). However, most of PM interval is based on experience or original equipment manufacturer (OEM) recommendations. Consequently, the benefits from PM are not...

Journal: :J. Scheduling 2007
Min Ji Yong He T. C. Edwin Cheng

We consider a single-machine scheduling problem with periodic maintenance activities. Although the scheduling problem with maintenance has attracted researchers’ attention, most of past studies considered only one maintenance period. In this research several maintenance periods are considered where each maintenance activity is scheduled after a periodic time interval. The objective is to find a...

Journal: :journal of industrial engineering, international 2006
v. o. oladokun o. e. charles-owaba c. s. nwaouzru

this study shows the usefulness of artificial neural network (ann) in maintenance planning and man-agement. an ann model based on the multi-layer perceptron having three hidden layers and four processing elements per layer was built to predict the expected downtime resulting from a breakdown or a maintenance activity. the model achieved an accuracy of over 70% in predicting the expected downtime.

The present investigation presents a stochastic model for a flexible manufacturing system consisting of flexible machine, loading/unloading robot and an automated pallethandling device. We consider unreliable flexible manufacturing cell (FMC) wherein machine and robot operate under individual as well as common cause random failures. The pallethandling system is completely reliable. The pallet o...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید