نتایج جستجو برای: multi skilled project scheduling

تعداد نتایج: 764617  

Journal: :journal of optimization in industrial engineering 2013
mostafa nikkhah nasab amir abbas najafi

projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. an integer programming model is formulated for the project portfolio selection and scheduling.two heuristic algorithms, genetic algorithm (ga) and simulated annealing (sa), are presented to solve the problem. results of cal...

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

A. Csébfalvi , E. Szendrői ,

This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...

Journal: :journal of optimization in industrial engineering 0
javad hasanpour quchan university of advanced technology mohammad ghodoosi university of torbat-e heydarieh zahra sadat hosseini k.n. toosi university of technology

the aim of a multi-mode resource-constrained project scheduling problem (mrcpsp) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). these goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

2014

This research proposes a preemptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of makespan. However, both time and cost should be con...

Journal: :journal of optimization in industrial engineering 2011
sedigheh nader abadi emad roghanian hadi aghassi

in this paper, we present a genetic algorithm (ga) for optimization of a multi-mode resource constrained time cost trade off (mrctct) problem. the proposed ga, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. beyond earlier studies on time-cost trade-off problem, in mrctct problem, resource requirements of each execution mo...

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید