Journal: :مدیریت صنعتی 0
حسین صفری دانشیار، مدیریت صنعتی، دانشکدۀ مدیریت دانشگاه تهران، تهران، ایران علیرضا فقیه دانشجوی دکتری مدیریت گرایش تحقیق در عملیات، دانشکدۀ مدیریت، دانشگاه تهران، تهران، ایران

the scheduling problems are the non-polynomial problems-hard (np-hard), is to solve it, and meta-heuristic innovative method compared with the exact method require less time and memory.in this research, developed imperialistic competitive algorithm used to solving the single-mode resource-constrained project scheduling problem.also the basic feasible solution algorithm used in order to increase...

2008
B. Ashtiani R. Leus M. Aryanezhad Behzad Ashtiani Roel Leus Mir-Bahador Aryanezhad

We study the resource-constrained project scheduling problem with stochastic activity durations. We introduce a new class of scheduling policies for this problem, which make a number of a-priori sequencing decisions in a pre-processing phase, while the remaining decisions are made dynamically during project execution. The pre-processing decisions entail the addition of precedence constraints to...

1999
HONGQI PAN ROBERT J. WILLIS CHUNG-HSING YEH

Resource-constrained project scheduling (RCPS) is often a challenging issue in practice, due to its combinatorial nature and uncertainty. This paper presents the framework of a heuristic approach to fuzzy RCPS problems using a fuzzy parallel scheduling method. This approach can handle both fuzzy and crisp numbers which commonly coexist in many realistic RCPS problems. Key-Words: Resource-constr...

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

Journal: :مهندسی عمران فردوسی 0
محمد حسن سبط محمدرضا افشار یعقوب علیپوری

in this paper, a fully informed particle swarm (fips) algorithm is proposed for solving the multi-mode resource-constrained project scheduling problem (mrcpsp) with minimization of project makespan as the objective subject to resource and precedence constraints. in the proposed fips, a random key and the related mode list (ml) representation scheme are used as encoding schemes and the multi-mod...

This paper presents a multi-mode resource-constrained project scheduling problem (MRCPSP) with maximizing the net present value (NPV) form the project contractor’s point of view. Positive and negative cash flows are considered in this model. Furthermore, to make the model close to the real situations, four different models for positive cash flows are considered. Two meta-heuristics, called simu...

2012
Miloš Šeda

Resource-constrained project scheduling is an NPhard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed imme...

Sama Ahmadpour Vahidreza Ghezavati

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...