نتایج جستجو برای: body repair shop

تعداد نتایج: 870905  

2011
Maliheh Aramon Bajestani Christopher Beck

We study a dynamic repair shop scheduling problem in the context of military aircraft fleet management. A number of flights, each with a requirement for a specific number and type of aircraft, are already scheduled over a long horizon. The overall scheduling horizon is considered to be composed of multiple time periods. The goal is to maintain a full complement of aircraft. We need to assign ai...

2013
Pedram Sahba Dragan Banjevic

In this paper, we consider a repair shop that fixes failed components from different k-out-of-n:G systems. We assume that each system consists of the same type of component; to increase availability, a certain number of critical components are stocked as spare parts. We permit a shared inventory serving all systems and/or reserved inventories for each system; we call this a hybrid model. Additi...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه پیام نور - دانشگاه پیام نور استان تهران - دانشکده علوم ریاضی و مهندسی کامپیوتر 1392

heuristics are often used to provide solutions for flow shop scheduling problems.the performance of a heuristic is usually judged by comparing solutions and run times on test cases.this investigation proposes an analytical alternative ,called asymptotic convergence ,which tests the convergence of the heuristic to a lower bound as problem size grows. the test is a stronger variation of worst cas...

Journal: :Ciencia & saude coletiva 2009
Eduardo Borba Neves Nelson Mendonça Junior Maria de Fátima Ramos Moreira

The aim of this study was the occupational exposure assessment to lead and manganese of workers in an armament repair shop of a military organization. The air of the working environment was assessed in the environmental monitoring while the internal dose biological indicators for lead and manganese, in blood and urine, were used in biological monitoring. Metals concentration in filters and biol...

Journal: :E-Jurnal Matematika 2022

One example of transportation problems is the Shvan Art Shop, which engaged in exporting 20 cm rattan bags. In distributing bags, Shop does not directly send goods to their destination, but still through intermediaries. To overcome this problem, a transshipment model can be used get distribution line so that outgoing costs are minimal. The purpose study compare before applying with after using ...

1996
J. E. Spragg Gerry Kelleher

We present here a discipline for job shop reschedub ing based on partial order backtracking. We show that partial order backtracking offers the rescheduler a framework for schedule repair, based upon a set of nocdoods, which impose a systematic paxtial order on the set of activities to be repaired but allows non systematic techniques to be used within that framework. We present rescheduling as ...

1995
G Kelleher J E Spragg

We present here a discipline for job shop rescheduling based on partial order backtracking. We show that partial order backtracking ooers the rescheduler a framework for schedule repair, based upon a set of nogoods, which impose a systematic partial order on the set of activities to be repaired but allows non systematic techniques to be used within that framework. We present rescheduling as par...

2003
Kai Gersmann Barbara Hammer

The resource constraint project scheduling problem (RCPSP) is an NP-hard benchmark problem in scheduling which takes into account the limitation of resources’ availabilities in real life production processes and subsumes open-shop, job-shop, and flow-shop scheduling as special cases. We here present an application of machine learning to adapt simple greedy strategies for the RCPSP. Iterative re...

2011
Yael Perlman Ilya Levner

This paper considers an inventory system responsible for repairable equipments located at several operational sites, each in different area. When a failure occurs at the operational site, spare parts are required. We analyze a multiple-supplier inventory system that includes an internal repair shop that offers several modes of repair with different repair times and an external supplier of spare...

2007
Ian Warfield Chad Hogg Stephen Lee-Urban Hector Muñoz-Avila

This paper presents RepairSHOP a system capable of performing plan adaptation and plan repair. RepairSHOP is built on top of the HTN planner SHOP. RepairSHOP has three properties. The first property is its design modularity, which makes it is straightforward to apply the same process discussed in this paper to build plan adaptation capabilities in other HTN planners. Second, RepairSHOP can perf...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید