نتایج جستجو برای: weighted mean completion time

تعداد نتایج: 2431357  

A. Bozorgi Amiri, R. Rashid, S. M. Seyedhoseini,

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

Journal: :ژورنال بین المللی پژوهش عملیاتی 0
r. rashid s. m. seyedhoseini a. bozorgi amiri

preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. in this paper, the same problem has been considered in which objective is to minimize the mean flow time. to prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. o...

Journal: :Engineering Applications of Artificial Intelligence 2008

2012
Leila Emami

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequencedependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the ov...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید