نتایج جستجو برای: time scheduling

تعداد نتایج: 1931013  

Amir Masoud Rahmani Marjan Abdeyazdan, Saeed Parsa

Task graph scheduling is a multi-objective optimization and NP-hard problem. In this paper a new algorithm on homogeneous multiprocessors systems is proposed. Basically, scheduling algorithms are targeted to balance the two parameters of time and energy consumption. These two parameters are up to a certain limit in contrast with each other and improvement of one causes reduction in the othe...

Journal: :journal of optimization in industrial engineering 2010
hassan rashidi

in static scheduling problem, where there is no change in situation, the challenge is that the large problems can be solved in a short time. in this paper, the static scheduling problem of automated guided vehicles in container terminal is solved by the network simplex algorithm (nsa). the algorithm is based on graph model and their performances are at least 100 times faster than traditional si...

Journal: :international journal of supply and operations management 2014
bahman naderi vahid roshanaei

in some industries as foundries, it is not technically feasible to interrupt a processor between jobs. this restriction gives rise to a scheduling problem called no-idle scheduling. this paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. the problem is first mathematically formulated by three different mixed integer linear programming...

Journal: :journal of optimization in industrial engineering 2014
mohammad asghari samaneh nezhadali

appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. one type of scheduling problems is just-in-time (jit) scheduling and in this area, motivated by jit manufacturing, this study investigates a mathematical model for...

Muhammad Huzaifa Raza Muhammad Shafiq Muhammad Umair Akhtar

Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...

D. Gupta, P. Singla, S. Bala,

The present paper is an attempt to develop a new heuristic algorithm, find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times and set up time are associated with their respective probabilities including transportation time. Further jo...

Scheduling is an important subject of production and operations management area. In flow-shop scheduling, the objective is to obtain a sequence of jobs which when processed in a fixed order of machines, will optimize some well defined criteria. The concept of transportation time is very important in scheduling. Transportation can be done by robots. In situations that robots are used to transpor...

Abdollahi, A. , Mollahassani-pour, M. , Nikbakhsh, S. , Rashidinejad, M. ,

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

Journal: :journal of industrial engineering, international 2006
s.s hashemin s.m.t fatemi ghomi

this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...

This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید