Based on current researches and developments of open-pit mine slope in China, the engineering features of open-pit mine slopes are summarized. Mine slope is basically formed by dynamic excavation of multi-level and multi-type, and mining benefit is the purpose of mine slope engineering when using various schemes and/or methods. Thus, the issues of design and stability analyses are the main conc...
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...
Slope stability is one of the most important issues in open pit mining design. The main purpose of any open pit mine design is to propose an optimal excavation configuration, considering safety, ore recovery and financial return. An accurate pit slope design which accounts for the mine geology, structural geology, rock mass properties, and hydrogeology models of the mine area, drastically enhan...
One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...
We consider the problem of finding an optimal mining sequence for an open pit during a number of time periods subject to only spatial and temporal precedence constraints. This problem is of interest because such constraints are generic to any open-pit scheduling problem and, in particular, because it arises as a Lagrangean relaxation of an open-pit scheduling problem. We show that this multi-pe...
determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. one of the important operational con...
We present a methodology for long-term mine planning based on a general capacitated multicommodity network flow formulation. It considers underground and open-pit ore deposits sharing multiple downstream processing plants over a long horizon. The purpose of the model is to optimize several mines in an integrated fashion, but real size instances are hard to solve due to the combinatorial nature ...
This paper is based on the open pit to underground mining practice of Daye Iron Mine. The influence mechanism between high-steep slope and non-pillar sublevel caving method is studied by using physical model test. Firstly, engineering geological properties of the choosing typical research section is analysed and generalized. Secondly, the system of open pit to underground mining is developing a...
Introduction: Workers in open pit mines are frequently exposed to extreme heat stress during hot seasons. Several indices including Modified Discomfort Index (MDI) are used to evaluate the heat stress. The aim of this study was to evaluate the MDI and to investigate its relationship with ISO 7243 standard (Wet Bulb Globe Temperature index, WBGT) and physiological parameters of workers in an ope...