نتایج جستجو برای: open pit mine production scheduling

تعداد نتایج: 1070868  

2013
Daniel Espinoza Adolfo Ibañez

In order to carry out an open pit mining operation, planners must periodically prepare what is known as strategic mine plan. This is a tentative production schedule for the remaining life of the mine that defines which area of a mining reserve will be extracted, in what years this extraction will take place, which resources will be used for the extraction, and how the extracted material will be...

2004
M. Godoy R. Dimitrakopoulos

Open pit mine design and production scheduling deals with the quest for the most profitable mining sequence over the life of a mine. The dynamics of mining ore and waste and the spatial grade uncertainty make predictions of the optimal mining sequence a challenging task. A new optimization approach to production scheduling based on the effective management of waste mining and orebody grade unce...

One of the most effective parameters in economics of open-pit mines is the pit slope angle, so that the slope angle more than the optimum value increases the probability of a large failure in the pit wall and the slope angle less than the optimum value leads to increasing stripping ratio and reducing net present value of mine. Therefore, in this paper, considering the limit equilibrium methods ...

2012
Andreas Bley Natashia Boland Gary Froyland Mark Zuckerberg

The open-pit mine production scheduling problem has received a great deal of attention in recent years, both in the academic literature, and in the mining industry. Optimization approaches to strategic planning for mine exploitation have become the industry standard, as the recent review of Newman et al. [19] highlights. However most of these approaches focus on extraction sequencing, and don’t...

Journal: :iranian journal of fuzzy systems 2014
iraj alavi

all steps of a mining project generally disturb the environment'soriginal condition during construction. therefore, it is crucial toimplement an appropriate mine reclamation plan throughout all mineplanning stages from sustainable and environmental point of view.planting the suitable plant species in each step of any reclamationplan and each area is one of the necessities in this respect.select...

2014
Amina Lamghari Roussos Dimitrakopoulos Jacques A Ferland

Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual larg...

Journal: :JORS 2014
Amina Lamghari Roussos G. Dimitrakopoulos Jacques A. Ferland

Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual larg...

Journal: :int. journal of mining & geo-engineering 2012
a. khodayari a. jafarnejad

in the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. different goals may be used for determining optimum cut-off grade. one of...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید