نتایج جستجو برای: mode project scheduling

تعداد نتایج: 527678  

Journal: :مهندسی صنایع 0
جعفر باقری نژاد استادیار دانشکده مهندسی صنایع - دانشگاه الزهرا (س) فریبرز جولای استاد دانشکده مهندسی صنایع -پردیس دانشکده های فنی-دانشگاه تهران زهرا رفیعی مجد کارشناس ارشد مهندسی صنایع - دانشگاه الزهرا (س)

in this study, we present a mrcpsp/max (multi-mode resource-constrained project scheduling problem with minimum and maximum time lags) model with minimization tardiness costs and maximization earliness rewards of activities as objective. the proposed model is nearby to real-world problems and has wide applications in various projects. this problem is not available in the literature exactly and ...

Journal: :European Journal of Operational Research 2011
José Coelho Mario Vanhoucke

This paper reports on a new solution approach for the well-known multi-mode resource-constrained project scheduling problem (MMRCPSP). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and non-renewable) resource feasible project schedule with a minimal makespan. The problem type is known to be NPh...

Journal: :Computers & Operations Research 2023

This paper reviews compact continuous-time formulations for the multi-mode resource-constrained project scheduling problem. Specifically, we first point out a serious flaw in an existing start-end-event-based formulation owing to inconsistent mode choices. We propose two options formulate missing constraints and consider equivalent reformulation with sparser constraint matrix. Second, aggregate...

1996
Frank Salewski Andreas Schirmer Andreas Drexl

A recurring problem in project management involves the allocation of scarce resources to the individual jobs comprising the project. In many situations such as audit-staff scheduling, timetabling, and course scheduling, the resources correspond to individuals (skilled labour). This naturally leads to an assignment-type project scheduling problem, i.e. a project has to be performed by assigning ...

Journal: :journal of optimization in industrial engineering 2011
sedigheh nader abadi emad roghanian hadi aghassi

in this paper, we present a genetic algorithm (ga) for optimization of a multi-mode resource constrained time cost trade off (mrctct) problem. the proposed ga, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. beyond earlier studies on time-cost trade-off problem, in mrctct problem, resource requirements of each execution mo...

Journal: :journal of optimization in industrial engineering 0
javad hasanpour quchan university of advanced technology mohammad ghodoosi university of torbat-e heydarieh zahra sadat hosseini k.n. toosi university of technology

the aim of a multi-mode resource-constrained project scheduling problem (mrcpsp) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). these goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

Journal: :Journal of the Operational Research Society 2011

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید