نتایج جستجو برای: load restoration

تعداد نتایج: 198319  

2005
G. Laccetti L. Maddalena A. Petrosino

Many algorithms have been proposed in literature for digital film restoration; unfortunately, none of them ensures a perfect restoration whichever is the image sequence to be restored. Here, we propose an approach to digital scratch restoration based on image fusion techniques for combining relatively well assested distinct techniques. The method has large memory requirements and is computation...

2014
Yen-Hsiang Chang Jin-Jie Yu Chun-Li Lin

BACKGROUND This study investigates CAD/CAM ceramic cusp-replacing restoration resistance with and without buccal cusp replacement under static and dynamic cyclic loads, monitored using the acoustic emission (AE) technique. METHOD The cavity was designed in a typical MODP (mesial-occlusal-distal-palatal) restoration failure shape when the palatal cusp has been lost. Two ceramic restorations [w...

2012
SATHISH KUMAR

The aim of this paper is to optimize the system after restoring and reconfigure the faulted area in a distribution network after isolating the faulted block. Restoration involves changing the switch status to maximize the supply to loads that are left unsupplied after fault removal. After system optimization using reconfiguration, Field Programmable Gate Array (FPGA) is used in order to control...

2011
Carleton Coffrin Pascal van Hentenryck Russell Bent Pascal Van Hentenryck

This paper studies the applicability of the linearized DC model in optimizing power restoration after significant network disruptions. In such circumstances, no AC base-point solution exists and the objective is to maximize the served load. The paper demonstrates that the accuracy of the linearized DC model degrades with the size of the disaster and that it can significantly underestimate activ...

2016
Hua Ye Yutian Liu

In restoring a power system after a major disturbance, system operators often encounter an excessive standing phase angle difference (SPA) between two buses of a circuit breaker when a transmission line is energized and results in a loop closure. Under such a condition, there is high risk of damage to nearby generators and other equipments for the breaker/loop closure operation. Since the SPA v...

Journal: :Journal of immunology 2005
Erwan Piriou Christine A Jansen Karel van Dort Iris De Cuyper Nening M Nanlohy Joep M A Lange Marinus H J van Oers Frank Miedema Debbie van Baarle

The incidence of (EBV-related) malignancies in HIV-infected subjects has declined since the introduction of highly active antiretroviral therapy (HAART). To investigate the effect of HAART on EBV infection, we performed a longitudinal analysis of the T cell response to both a latent and a lytic Ag and EBV viral load in 10 subjects from early in HIV infection up to 5 years after HAART. All indiv...

2011
Alexandre de Assis Mota Lia Toledo Moreira Mota Claudia Cotrim Pezzuto

Problem statement: During service restoration, the power level at buses can significantly differ from the one presented under steady-state conditions, demanding an amount of electric power significantly higher than the normal load. Hence, their post-outage behavior must be adequately forecasted in order to permit the development of reliable restoration plans, or to avoid inadequate actions that...

2005
Canbolat UÇAK

Most of the customer outages are the results of some problems related to distribution systems. Prolonged outages may cause cold load pickup problems because of the increased penetration of thermostaticallycontrolled devices and the loss of diversity among these devices. Since loads higher than normal may be expected after prolonged outages, restoration problems may occur when there is not enoug...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید