2010
Ashwani Dhingra Pankaj Chandna

Purpose – In order to achieve excellence in manufacturing, goals like lean, economic and quality production with enhanced productivity play a crucial role in this competitive environment. It also necessitates major improvements in generally three primary technical areas: variation reduction, equipment reliability, and production scheduling. Complexity of the real world scheduling problems also ...

2010
Ye Li Yan Chen

In this paper, we analyze the characteristics of the dynamic job shop scheduling problem when machine breakdown and new job arrivals occur. A hybrid approach involving neural networks(NNs) and geneticalgorithm(GA) is presented to solve the dynamic job shop scheduling problem as a static scheduling problem. The objective of this kind of job shop scheduling problem is minimizing the completion ti...

Journal: :Int. J. Computational Intelligence Systems 2008
Cengiz Kahraman Orhan Engin Ihsan Kaya Mustafa Kerim Yilmaz

This paper addresses the Hybrid Flow Shop (HFS) scheduling problems to minimize the makespan value. In recent years, much attention is given to heuristic and search techniques. Genetic algorithms (GAs) are also known as efficient heuristic and search techniques. This paper proposes an efficient genetic algorithm for hybrid flow shop scheduling problems. The proposed algorithm is tested by Carli...

2012
M. Fikret Ercan

Multiprocessor task scheduling is a generalized form of classical machine scheduling where a task is processed by more than one processor. It is a challenging problem encountered in wide range of applications and it is vastly studied in the scheduling literature (see for instance (Chan & Lee, 1999 and Drozdowski, 1996) for a comprehensive introduction on this topic). However, Drozdowski (1996) ...

2010
Ashwani Dhingra Pankaj Chandna

In this work, multicriteria decision making objective for flow shop scheduling with sequence dependent set up time and due dates have been developed. Multicriteria decision making objective includes total tardiness, total earliness and makespan simultaneously which is very effective decision making for scheduling jobs in modern manufacturing environment. As problem of flow shop scheduling is NP...

Mahsa Ghandehari Mohammad Modarres

In this paper, we first introduce a generalized version of open shop scheduling (OSS), called generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of metaheuristic to solve this problem. Open shop scheduling is concerned with processing n jobs on m machines, where each job has exactly m operations and operation i of each job has to be processed on machine i . However...

Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...

Journal: :European Journal of Operational Research 2007
Christos Koulamas George J. Kyparisis

We study the problem of minimizing the makespan in a two-stage assembly flow shop scheduling problem with uniform parallel machines. This problem is a generalization of the assembly flow shop problem with concurrent operations in the first stage and a single assembly operation in the second stage. We propose a heuristic with an absolute performance bound which becomes asymptotically optimal as ...

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

Journal: :Computer systems science and engineering 2023

The two-stage hybrid flow shop problem under setup times is addressed in this paper. This NP-Hard. on the other hand, studied modeling different real-life applications especially manufacturing and high performance-computing. Tackling kind of requires development adapted algorithms. In context, a metaheuristic using genetic algorithm three heuristics are proposed These approximate solutions opti...