نتایج جستجو برای: flexible job shop scheduling local search makespan meta heuristics teaching
تعداد نتایج: 1335570 فیلتر نتایج به سال:
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
in this paper, we considered solving approaches to flexible job shop problems. makespan is not a good evaluation criterion with overlapping in operations assumption. accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. as overlapping in operations is a practical assumption in chemical, petrochemical, and gla...
In this paper we consider n-jobs, m-machines permutation flow shop scheduling problems. Flow shop scheduling is one of the most important combinational optimization problems. The permutation flow shop scheduling problems are NP-Hard (Non deterministic Polynomial time Hard). Hence many heuristics and metaheuristics were addressed in the literature to solve these problems. In this paper a hybrid ...
Keywords: Scheduling Flexible job shop Differential evolution Local search Neighborhood structure Makespan a b s t r a c t This paper proposes hybrid differential evolution (HDE) algorithms for solving the flexible job shop scheduling problem (FJSP) with the criterion to minimize the makespan. Firstly, a novel conversion mechanism is developed to make the differential evolution (DE) algorithm t...
This paper is concerned with local search methods to solve job shop scheduling problems with uncertain durations modelled as fuzzy numbers. Based on a neighbourhood structure from the literature, a reduced set of moves and the consequent structure are defined. Theoretical results show that the proposed neighbourhood contains all the improving solutions from the original neighbourhood and provid...
In this paper, scheduling problems in Flexible Manufacturing Cells (FMC) are studied. The scheduling objective is to minimize the makespan. We used a genetic algorithm (GA) for solving the optimization scheduling problem. We have developed one FMC with industrial characteristics with the objective of studying scheduling problems in these types of manufacturing systems (single machine scheduling...
The flexible job shop scheduling problem is a well-known combinatorial optimization problem. This paper proposes an improved shuffled frog-leaping algorithm to solve the flexible job shop scheduling problem. The algorithm possesses an adjustment sequence to design the strategy of local searching and an extremal optimization in information exchange. The computational result shows that the propos...
The flexible job shop scheduling problem (FJSP) is a generalization of the classical job shop scheduling problem that allows to process operations on one machine out of a set of alternative machines. The FJSP is an NP-hard problem consisting of two sub-problems, which are the assignment and the scheduling problems. In this paper, we propose how to solve the FJSP by hybrid metaheuristics-based c...
The problem of efficiently scheduling production jobs on several machines is an important consideration when attempting to make effective use of a multimachines system such as a flexible job shop scheduling production system (FJSP). In most of its practical formulations, the FJSP is known to be NP-hard [8][9], so exact solution methods are unfeasible for most problem instances and heuristic app...
This paper addresses the flexible job shop scheduling problem with minimization of the makespan, maximum machine workload, and total machine workload as the objectives. A multiobjective memetic algorithm is proposed. It belongs to the integrated approach, which deals with the routing and sequencing sub-problems together. Dominance-based and aggregation-based fitness assignment methods are used ...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید