Journal: :Eng. Appl. of AI 2010
Safa Khalouli Fatima Ghedjati Abdelaziz Hamzaoui

In this paper we address a hybrid flow shop scheduling problem considering the minimization of the sum of the total earliness and tardiness penalties. This problem is proven to be NP-hard, and consequently the development of heuristic and meta-heuristic approaches to solve it is well justified. So, we propose an ant colony optimization method to deal with this problem. Our proposed method has s...

Journal: :J. Heuristics 2007
Shih-Wei Lin Shuo-Yan Chou Shih-Chieh Chen

This study addresses a class of single-machine scheduling problems involving a common due date where the objective is to minimize the total job earliness and tardiness penalties. A genetic algorithm (GA) approach and a simulated annealing (SA) approach utilizing a greedy local search and three well-known properties in the area of common due date scheduling are developed. The developed algorithm...

Journal: :CoRR 2009
Martin Josef Geiger

The single machine total weighted tardiness problem (SMTWTP) is a well-known planning problem from operations research, engineering and computer science. It is characterized by the assignment of starting times for a given set of jobs on a single processor, minimizing the (weighted) tardy completion of the jobs with respect to given due dates. In this sense, the tardiness is given an economical ...

Journal: :Computers & OR 2004
Ghaith Rabadi Mansooreh Mollaghasemi Georgios C. Anagnostopoulos

The single-machine early/tardy (E/T) scheduling problem is addressed in this research. The objective of this problem is to minimize the total amount of earliness and tardiness. Earliness and tardiness are weighted equally and the due date is common and large (unrestricted) for all jobs. Machine setup time is included and is considered sequence-dependent. When sequence-dependent setup times are ...

Journal: :Computers & Industrial Engineering 2010
Kenneth R. Baker Brian Keller

Various integer programming models have been proposed for sequencing problems. However, little is known about the practical value of these models. This paper reports a comparison of six different integer programming formulations of the single-machine total tardiness problem. We created a set of especially difficult test problems and attempted to solve them with each of the formulations, using C...

2000
Andreas Bauer Bernd Bullnheimer Richard F. Hartl Christine Strauss

Ant Colony Optimization is a relatively new meta-heuristic that has proven its quality and versatility on various combinatorial optimization problems such as the traveling salesman problem, the vehicle routing problem and the job shop scheduling problem. The paper introduces an Ant Colony Optimization approach to solve the problem of determining a job-sequence that minimizes the overall tardine...

Journal: :international journal of industrial engineering and productional research- 0
m. ranjbar no.516, department of industrial engineering, faculty of engineering, ferdowsi university of mashhad

in this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. in this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. in other words, there is a dictated ready date as well as a d...

2010
Nabeel Mandahawi Sameh Al-Shihabi Safwan Altarazi

Given the anticipated benefits of better solutions, the scheduling problem of minimizing the total tardiness for single machine with sequence dependent setup times continues to represent a challenge for researchers to resolve. This research presents a novel Max-Min Ant System (MMAS) algorithm for solving this problem. The MMAS algorithm adopts a new local search technique where, a position is r...

2006
Andreas C. Nearchou

A new meta-heuristic for scheduling multiple jobs on a single machine so that they are completed by a common specified date (neither earlier, nor later) is addressed in this paper. Costs are set depending on whether a job finished before (earliness), or after (tardiness) the specified due date. The objective is to minimize the total weighted earliness and tardiness penalized costs from the spec...