نتایج جستجو برای: periodic flexible maintenance planning random breakdown single machine setting simulation

تعداد نتایج: 2489312  

2000
Guilherme E. Vieira Jeffrey W. Herrmann

In dynamic, stochastic manufacturing systems, production planners and manufacturing engineers can benefit from understanding how rescheduling strategies affect system performance. This knowledge will help these experts design and operate better manufacturing planning and control systems. This paper presents new analytical models that can predict the performance of rescheduling strategies and qu...

In this paper, an integrated machine scheduling withits due date setting problem has been considered. It is assumed that the machine is subject to some kind of random unavailability. Due dates should be set in an attractive and reliable manner, implying that they should be short and possible to be met. To this end, first, long due dates are penalized in the objective function. Then, for each cu...

Alistair Clark Masoumeh Mahdieh Mehdi Bijari,

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

2011
Hajej Zied

In this paper, we deal with the problem of joint maintenance and production under a subcontracting and withdrawal right constraints. The manufacturing system consists of a machine M that produces a single product in order to satisfy a random demand under given service level constraint. We first establish an optimal production plan which minimizes the total inventory and production cost taking i...

Journal: :JORS 2013
Francisco Cisternas Diego Delle Donne Guillermo Durán Cristian Polgatiz Andres Weintraub

Abstract Salmon farming in Chile constitutes one of the nation's principal food exporting sectors. In the seawater stage, one of the most important in the farm production chain, salmon are cultivated in floating cages fitted with nets that hold the fish during the entire grow-out process. The maintenance of the cage nets is carried out at land-based facilities. This article reports on the creat...

2003
Ta-Hui Yang Shangyao Yan Hsuan-Hung Chen

An effective maintenance manpower supply plan not only reduces operating costs but ensures greater aviation safety and punctuality. A variety of flexible management strategies have been widely applied in other industries; however, little research has stressed flexible management strategies for airline crew scheduling problems. Here, we introduce a model that includes various flexible strategies...

Journal: :Jurnal Kejuruteraan 2022

The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. is grounded on analysis data collected from manufacturing based MSMEs review literature spare parts published referred journals. study derives a further framework model comprising three strategies (Supply chain management, inventory engineering) production. aforesa...

Journal: :journal of computer and robotics 0
neda nasiri department of electrical, computer and biomedical engineering, qazvin branch, islamic azad university, qazvin, iran houman sadjadian department of electrical engineering, iran university of science and technology, tehran, iran alireza mohammad shahri department of electrical engineering, iran university of science and technology, tehran, iran

joint flexibility is a very important factor to consider in the controller design for robot manipulators if high performance is expected. most of the research works on control of flexible-joint robots in literature have ignored the actuator dynamics to avoid complexity in controller design. the problem of designing nonlinear controller for a class of single-link flexible-joint robot manipulator...

2015
S. V. Kamble

Hybrid algorithm based on Particle Swarm Optimization (PSO) and Simulated annealing (SA) is proposed, to solve Flexible Job Shop Scheduling with five objectives to be minimized simultaneously: makespan, maximal machine workload, total workload, machine idle time & total tardiness. Rescheduling strategy used to shuffle workload once the machine breakdown takes place in proposed algorithm. The hy...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید