This paper presents a procedure to design reinforced concrete (RC) buildings achieve an acceptable target level of earthquake-induced loss (e.g., deaths, dollars, downtime) under site-specific hazard profile. The is called “direct” since the specified at first step process, and virtually no iteration required. based on simplified assessment involving surrogate model for seismic demand (i.e., pr...