نتایج جستجو برای: total earliness and tardiness

تعداد نتایج: 16875967  

Journal: :Mathematical and Computer Modelling 2006
Gur Mosheiov Daniel Oron

In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...

2006
Jan Kelbel Zdeněk Hanzálek

The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...

1999
MAGED DESSOUKY BRIAN KIJOWSKI SUSHIL VERMA

We consider the problem of determining the allocation of demand from different customer orders to production batches and the schedule of resulting batches to minimize the total weighted earliness and tardiness penalties in context of batch chemical processing. The problem is formulated as a mixed-integer nonlinear programming model. An iterative heuristic procedure that makes use of the network...

2014
Hamed Fazlollahtabar Mohammad Saidi-Mehrabad

The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...

1996
H. A. ten Kate J. Wijngaard

A single machine scheduling problem is described which covers earliness costs, tardiness costs and setup costs. Setups are needed whenever a switch is made to a job of another product family. All jobs within the same product family have the same processing time. Besides setup costs also setup times are involved. Idle time is allowed, preemption is not allowed. Both a mixed integer programming f...

2007
Jan Kelbel Zdeněk Hanzálek

This paper describes a constraint programming approach to solving a scheduling problem with earliness and tardiness cost using a problem specific search procedure. The presented algorithm is tested on a set of randomly generated instances of the job shop scheduling problem with earliness and tardiness costs. The experiments are executed also for three other algorithms, and the results are then ...

Journal: :Journal of Industrial and Management Optimization 2023

This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness...

2004
Michele Pfund John W. Fowler Jatinder N. D. Gupta

This paper surveys the literature related to solving traditional unrelated parallel-machine scheduling problems. It compiles algorithms for the makespan, total weighted sum of completion times, maximum tardiness, total tardiness, total earliness and tardiness, and multiple criteria performance measures. The review of the existing algorithms is restricted to the deterministic problems without se...

Journal: :بین المللی مهندسی صنایع و مدیریت تولید 0
ghasem moslehi professor of industrial engineering – isfahan university of technology kamran kianfar phd student of industrial engineering – isfahan university of technology

nowadays, scheduling problems have a considerable application in production and service systems. in this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. in many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combinat...

Journal: :Applied Mathematics and Computer Science 2013
Adam Janiak Tomasz Kwiatkowski Maciej Lichtenstein

In this article a survey of studies on scheduling problems with a common due window assignment and earliness/tardiness penalty functions is presented. A due window is a generalization of the classical due date and describes a time interval in which a job should be finished. If a job is completed before or after the due window, it incurs an earliness or a tardiness penalty, respectively. In this...