نتایج جستجو برای: repowering
تعداد نتایج: 75 فیلتر نتایج به سال:
Offshore wind turbines are normally designed for a nominal service life of 20 to 25 years; however, with significant number units approaching the second half their life, discussion on selecting most appropriate end-of-life scenario becomes ever more relevant. Scenarios be investigated mainly include decommissioning, repowering, or extension, while such decisions depend criteria which should tak...
Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or s...
The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Dynegy Power Corp., and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal-gasification combined-cycle plant in the world. This demonstration proj...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید