نتایج جستجو برای: parallel genetic algorithm
تعداد نتایج: 1478807 فیلتر نتایج به سال:
چکیده ندارد.
In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...
Over the past few decades great efforts were made to solve uncertain hybrid optimization problems. The n-Queen problem is one of such problems that many solutions have been proposed for. The traditional methods to solve this problem are exponential in terms of runtime and are not acceptable in terms of space and memory complexity. In this study, parallel genetic algorithms are proposed to solve...
Abstract In general redundancy allocation problems the redundancy strategy for each subsystem is predetermined. Tavakkoli- Moghaddam presented a series-parallel redundancy allocation problem with mixing components (RAPMC) in which the redundancy strategy can be chosen for individual subsystems. In this paper, we present a bi-objective redundancy allocation when the redundancy strategies for...
with the huge global and wide range of attention placed upon quality, promoting and optimize the reliability of the products during the design process has turned out to be a high priority. in this study, the researcher have adopted one of the existing models in the reliability science and propose a bi-objective model for redundancy allocation in the series-parallel systems in accordance with th...
this paper presents a new mathematical model for a redundancyallocation problem (rap) withcold-standby redundancy strategy and multiple component choices.the applications of the proposed model arecommon in electrical power, transformation,telecommunication systems,etc.manystudies have concentrated onone type of time-to-failure, butin thispaper, two components of time-to-failures which follow hy...
appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. one type of scheduling problems is just-in-time (jit) scheduling and in this area, motivated by jit manufacturing, this study investigates a mathematical model for...
The purpose of this paper is to examine the multidisciplinary design optimization (MDO) of a reentry vehicle. In this paper, optimization of a RV based on, minimization of heat flux integral and minimization of axial force coefficient integral and maximization of static margin integral along reentry trajectory is carried out. The classic optimization methods are not applicable here due to the c...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید