Simultaneous Batching and Scheduling for Chemical Processing with Earliness and Tardiness Penalties*
We consider the problem of determining the allocation of demand from different customer orders to production batches and the schedule of resulting batches to minimize the total weighted earliness and tardiness penalties in context of batch chemical processing. The problem is formulated as a mixed-integer nonlinear programming model. An iterative heuristic procedure that makes use of the network...
Scheduling problems involving both earliness and tardiness costs became more important in recent years. This kind of problems include both earliness and tardiness penalties and tries to reduce them. In this study a case study from real world is investigated. Since the machine is bottle neck in the production line and all jobs have a common restrictive due date and different earliness and tardin...
The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...
We study a common due-date assignment problem on two parallel uniform machines. The jobs are assumed to have identical processing times, and job-dependent asymmetric earliness tardiness unit costs. scheduler may process only subset of the jobs, i.e. option job-rejection is allowed. objective function consists three cost components: total earliness-tardiness all scheduled due-date, rejection cos...
Mixed Model Assembly Line Sequencing In Make to Order System with Available to Promise Consideration
Mixed model assembly lines (MMAL) are a type of production line where a variety of product models similar in product characteristics are assembled. The effective design of these lines requires that schedule for assembling the different products is determined. In this paper we tried to fit the sequencing problem with the main characteristics of make to order (MTO) environment. The problem solved...
Single machine, distinct due dates, early/lately machine problem and fuzzy environment closely models the situation faced by ‘Just In Time’ manufacturing. The objective of this paper is to sequence the jobs on the machine, so that the total penalty cost be minimum. This cost is composed of the total earliness and the total tardiness cost. An algorithm is developed here to minimize the total pen...
The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...
We consider the problem of scheduling of n jobs to minimize the total earliness and tardiness penalty. The scheduling objective is to minimize the sum of job dependent earliness and tardiness penalties.. After determining the scheduling for single machine common due date, using neural network, the result shows that the neural network solution performs very well.
In this article a survey of studies on scheduling problems with a common due window assignment and earliness/tardiness penalty functions is presented. A due window is a generalization of the classical due date and describes a time interval in which a job should be finished. If a job is completed before or after the due window, it incurs an earliness or a tardiness penalty, respectively. In this...
We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example.